Description of the power plant
Ground-based solar power plant PV Plant Dytyatkivska 2 Stage is located in north part of Ukraine - Ivankivskyi district, Kyivska region, Ukraine. The power plant is putted into operation on 2020 with installed capacity- 2.26 MW. Ltd "Sei Ukrayina" is a legal entity operating the power plant. It obtained the license for electricity generation on November 17, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.97 eurocents starting from December 30, 2020.
Putted into opperation
Sep 2020
Installed capacity
2.26 MW
DCFeed-in-Tariff
10.97¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "TEKK"General contractor
LTD "BBKH MIST"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Dytyatkivska 2 Stage?
- What group of companies does the PV Plant Dytyatkivska 2 Stage belong to?
- Who are the beneficial owners of PV Plant Dytyatkivska 2 Stage?
- What is the insolation at PV Plant Dytyatkivska 2 Stage?
- What is the current tariff in UAH for PV Plant Dytyatkivska 2 Stage?
- Is there a local component bonus for PV Plant Dytyatkivska 2 Stage and what is its size
- What is the capacity factor of PV Plant Dytyatkivska 2 Stage?
- What is the monthly electricity production of PV Plant Dytyatkivska 2 Stage?
- What is the annual revenue of PV Plant Dytyatkivska 2 Stage?
- What market share does PV Plant Dytyatkivska 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Dytyatkivska 2 Stage?
- Which company designed the project for PV Plant Dytyatkivska 2 Stage?
- Which company was the general contractor for PV Plant Dytyatkivska 2 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Dytyatkivska 2 Stage?
- What is the size of the land plot on which PV Plant Dytyatkivska 2 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Dytyatkivska 2 Stage is located?
- What are the exact coordinates of the location of PV Plant Dytyatkivska 2 Stage?
- When were the grid connection specification forPV Plant Dytyatkivska 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Dytyatkivska 2 Stage
- Land allocation documentationPV Plant Dytyatkivska 2 Stage
- Construction permits and declarative documentationPV Plant Dytyatkivska 2 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Dytyatkivska 2 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Dytyatkivska 2 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Dytyatkivska 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.