Description of the power plant
Ground-based solar power plant PV Plant Eko Solar Steyshn is located in east part of Ukraine - Tomashpilskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 20.01 MW. Ltd "Eko Solar Steyshn" is a legal entity operating the power plant. It obtained the license for electricity generation on December 10, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from December 20, 2019.
Putted into opperation
Dec 2019
Installed capacity
20.01 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Longi Solar | LR6-72HPH-385M | |||
KNESS | PVCIS.2500 |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Eko Solar Steyshn?
- What group of companies does the PV Plant Eko Solar Steyshn belong to?
- Who are the beneficial owners of PV Plant Eko Solar Steyshn?
- What is the insolation at PV Plant Eko Solar Steyshn?
- What is the current tariff in UAH for PV Plant Eko Solar Steyshn?
- Is there a local component bonus for PV Plant Eko Solar Steyshn and what is its size
- What is the capacity factor of PV Plant Eko Solar Steyshn?
- What is the monthly electricity production of PV Plant Eko Solar Steyshn?
- What is the annual revenue of PV Plant Eko Solar Steyshn?
- What market share does PV Plant Eko Solar Steyshn have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Eko Solar Steyshn?
- Which company designed the project for PV Plant Eko Solar Steyshn?
- Which company was the general contractor for PV Plant Eko Solar Steyshn?
- What generating equipment (solar panels and inverters) is installed in PV Plant Eko Solar Steyshn?
- What is the size of the land plot on which PV Plant Eko Solar Steyshn is located?
- What are the cadastral numbers of the parcels on which PV Plant Eko Solar Steyshn is located?
- What are the exact coordinates of the location of PV Plant Eko Solar Steyshn?
- When were the grid connection specification forPV Plant Eko Solar Steyshn issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Eko Solar Steyshn
- Land allocation documentationPV Plant Eko Solar Steyshn
- Construction permits and declarative documentationPV Plant Eko Solar Steyshn
- Environmental Impact Assessment (EIA) DocumentsPV Plant Eko Solar Steyshn
- Feed-In-Tariff Setting DocumentsPV Plant Eko Solar Steyshn
The presented list reflects the directions in which information on assets is collected. On the PV Plant Eko Solar Steyshn some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.