Description of the power plant
Ground-based solar power plant PV Plant Ekoenerhoservis Dnipro 3 Stage is located in east part of Ukraine - Solonianskyi district, Dnipropetrovska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 2.03 MW. Ltd "Ekoenerhoservis Dnipro" is a legal entity operating the power plant. It obtained the license for electricity generation on February 10, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from August 20, 2019.
Putted into opperation
Aug 2019
Installed capacity
2.03 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "SK SOLAR"General contractor
LTD "SK SOLAR"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Ekoenerhoservis Dnipro 3 Stage?
- What group of companies does the PV Plant Ekoenerhoservis Dnipro 3 Stage belong to?
- Who are the beneficial owners of PV Plant Ekoenerhoservis Dnipro 3 Stage?
- What is the insolation at PV Plant Ekoenerhoservis Dnipro 3 Stage?
- What is the current tariff in UAH for PV Plant Ekoenerhoservis Dnipro 3 Stage?
- Is there a local component bonus for PV Plant Ekoenerhoservis Dnipro 3 Stage and what is its size
- What is the capacity factor of PV Plant Ekoenerhoservis Dnipro 3 Stage?
- What is the monthly electricity production of PV Plant Ekoenerhoservis Dnipro 3 Stage?
- What is the annual revenue of PV Plant Ekoenerhoservis Dnipro 3 Stage?
- What market share does PV Plant Ekoenerhoservis Dnipro 3 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Ekoenerhoservis Dnipro 3 Stage?
- Which company designed the project for PV Plant Ekoenerhoservis Dnipro 3 Stage?
- Which company was the general contractor for PV Plant Ekoenerhoservis Dnipro 3 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Ekoenerhoservis Dnipro 3 Stage?
- What is the size of the land plot on which PV Plant Ekoenerhoservis Dnipro 3 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Ekoenerhoservis Dnipro 3 Stage is located?
- What are the exact coordinates of the location of PV Plant Ekoenerhoservis Dnipro 3 Stage?
- When were the grid connection specification forPV Plant Ekoenerhoservis Dnipro 3 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Ekoenerhoservis Dnipro 3 Stage
- Land allocation documentationPV Plant Ekoenerhoservis Dnipro 3 Stage
- Construction permits and declarative documentationPV Plant Ekoenerhoservis Dnipro 3 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Ekoenerhoservis Dnipro 3 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Ekoenerhoservis Dnipro 3 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Ekoenerhoservis Dnipro 3 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.