Description of the power plant
Ground-based solar power plant PV Plant Ekotekhnik Rozhnyativ is located in west part of Ukraine - Rozhniativskyi district, Ivano-Frankivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 5.09 MW. Ltd "Ekotekhnik Rozhnyativ" is a legal entity operating the power plant. It obtained the license for electricity generation on January 14, 2020 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from January 24, 2020.
Putted into opperation
Dec 2019
Installed capacity
5.09 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "EKOTEKHNIK UKRAYINA HRUP"General contractor
LTD "EKOTEKHNIK UKRAYINA HRUP"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Ekotekhnik Rozhnyativ?
- What group of companies does the PV Plant Ekotekhnik Rozhnyativ belong to?
- Who are the beneficial owners of PV Plant Ekotekhnik Rozhnyativ?
- What is the insolation at PV Plant Ekotekhnik Rozhnyativ?
- What is the current tariff in UAH for PV Plant Ekotekhnik Rozhnyativ?
- Is there a local component bonus for PV Plant Ekotekhnik Rozhnyativ and what is its size
- What is the capacity factor of PV Plant Ekotekhnik Rozhnyativ?
- What is the monthly electricity production of PV Plant Ekotekhnik Rozhnyativ?
- What is the annual revenue of PV Plant Ekotekhnik Rozhnyativ?
- What market share does PV Plant Ekotekhnik Rozhnyativ have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Ekotekhnik Rozhnyativ?
- Which company designed the project for PV Plant Ekotekhnik Rozhnyativ?
- Which company was the general contractor for PV Plant Ekotekhnik Rozhnyativ?
- What generating equipment (solar panels and inverters) is installed in PV Plant Ekotekhnik Rozhnyativ?
- What is the size of the land plot on which PV Plant Ekotekhnik Rozhnyativ is located?
- What are the cadastral numbers of the parcels on which PV Plant Ekotekhnik Rozhnyativ is located?
- What are the exact coordinates of the location of PV Plant Ekotekhnik Rozhnyativ?
- When were the grid connection specification forPV Plant Ekotekhnik Rozhnyativ issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Ekotekhnik Rozhnyativ
- Land allocation documentationPV Plant Ekotekhnik Rozhnyativ
- Construction permits and declarative documentationPV Plant Ekotekhnik Rozhnyativ
- Environmental Impact Assessment (EIA) DocumentsPV Plant Ekotekhnik Rozhnyativ
- Feed-In-Tariff Setting DocumentsPV Plant Ekotekhnik Rozhnyativ
The presented list reflects the directions in which information on assets is collected. On the PV Plant Ekotekhnik Rozhnyativ some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.