Description of the power plant
Rooftop solar power plant PV Plant Enerho Hrup 2018 is located in south part of Ukraine - Pervomaiska city council, Mykolaivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 0.2 MW. Ltd "Enerho-Hrup-2018" is a legal entity operating the power plant. It obtained the license for electricity generation on October 31, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 16.37 eurocents starting from June 25, 2019.
Putted into opperation
May 2019
Installed capacity
0.2 MW
DCFeed-in-Tariff
16.37¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "HETMAN BRAZER’S HRUP"General contractor
SC ZAVOD "KAZAR-12"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Enerho Hrup 2018?
- What group of companies does the PV Plant Enerho Hrup 2018 belong to?
- Who are the beneficial owners of PV Plant Enerho Hrup 2018?
- What is the insolation at PV Plant Enerho Hrup 2018?
- What is the current tariff in UAH for PV Plant Enerho Hrup 2018?
- Is there a local component bonus for PV Plant Enerho Hrup 2018 and what is its size
- What is the capacity factor of PV Plant Enerho Hrup 2018?
- What is the monthly electricity production of PV Plant Enerho Hrup 2018?
- What is the annual revenue of PV Plant Enerho Hrup 2018?
- What market share does PV Plant Enerho Hrup 2018 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Enerho Hrup 2018?
- Which company designed the project for PV Plant Enerho Hrup 2018?
- Which company was the general contractor for PV Plant Enerho Hrup 2018?
- What generating equipment (solar panels and inverters) is installed in PV Plant Enerho Hrup 2018?
- What is the size of the land plot on which PV Plant Enerho Hrup 2018 is located?
- What are the cadastral numbers of the parcels on which PV Plant Enerho Hrup 2018 is located?
- What are the exact coordinates of the location of PV Plant Enerho Hrup 2018?
- When were the grid connection specification forPV Plant Enerho Hrup 2018 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Enerho Hrup 2018
- Land allocation documentationPV Plant Enerho Hrup 2018
- Construction permits and declarative documentationPV Plant Enerho Hrup 2018
- Environmental Impact Assessment (EIA) DocumentsPV Plant Enerho Hrup 2018
- Feed-In-Tariff Setting DocumentsPV Plant Enerho Hrup 2018
The presented list reflects the directions in which information on assets is collected. On the PV Plant Enerho Hrup 2018 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.