Description of the power plant
Ground-based solar power plant PV Plant Hlybochok Stage 1 is located in east part of Ukraine - Trostianetskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2012 with installed capacity- 1.31 MW. Ltd "Rendzhy Trostyanets" is a legal entity operating the power plant. It obtained the license for electricity generation on December 24, 2012 and permitted for the Feed-in-tariff in hryvnias equivalent of 46.53 eurocents starting from December 27, 2012.
Putted into opperation
Dec 2012
Installed capacity
1.31 MW
DCFeed-in-Tariff
46.53¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "DEY ENERDZHI UA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Hlybochok Stage 1?
- What group of companies does the PV Plant Hlybochok Stage 1 belong to?
- Who are the beneficial owners of PV Plant Hlybochok Stage 1?
- What is the insolation at PV Plant Hlybochok Stage 1?
- What is the current tariff in UAH for PV Plant Hlybochok Stage 1?
- Is there a local component bonus for PV Plant Hlybochok Stage 1 and what is its size
- What is the capacity factor of PV Plant Hlybochok Stage 1?
- What is the monthly electricity production of PV Plant Hlybochok Stage 1?
- What is the annual revenue of PV Plant Hlybochok Stage 1?
- What market share does PV Plant Hlybochok Stage 1 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Hlybochok Stage 1?
- Which company designed the project for PV Plant Hlybochok Stage 1?
- Which company was the general contractor for PV Plant Hlybochok Stage 1?
- What generating equipment (solar panels and inverters) is installed in PV Plant Hlybochok Stage 1?
- What is the size of the land plot on which PV Plant Hlybochok Stage 1 is located?
- What are the cadastral numbers of the parcels on which PV Plant Hlybochok Stage 1 is located?
- What are the exact coordinates of the location of PV Plant Hlybochok Stage 1?
- When were the grid connection specification forPV Plant Hlybochok Stage 1 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Hlybochok Stage 1
- Land allocation documentationPV Plant Hlybochok Stage 1
- Construction permits and declarative documentationPV Plant Hlybochok Stage 1
- Environmental Impact Assessment (EIA) DocumentsPV Plant Hlybochok Stage 1
- Feed-In-Tariff Setting DocumentsPV Plant Hlybochok Stage 1
The presented list reflects the directions in which information on assets is collected. On the PV Plant Hlybochok Stage 1 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.