PV Plant Holoby

Description of the power plant

Ground-based solar power plant PV Plant Holoby is located in west part of Ukraine - Kovelskyi district, Volynska region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 0.08 MW. Pe "Piket-Bud-Trans" is a legal entity operating the power plant. It obtained the license for electricity generation on May 17, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from January 30, 2018.

PE "PIKET-BUD-TRANS"

Putted into opperation

Mar 2017

Installed capacity

0.08 MW

DC

Feed-in-Tariff

15.03¢

Location

Kovelskyi district, Volynska region, Ukraine

Key Indicators

14.0%

Capacity Factor

The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.

105

Irradiation

Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)

15.03

Tariff

Tariff established by NERC
(eurocents/KWh)


a share of power plants with lower indicator value among all RES
a share of power plants with lower indicator value among power plants of the same type

Contractors

General contractor

PE PIKET

Additional information

In a paid subscription, you can additionally find answers to the following questions:

In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Holoby

The presented list reflects the directions in which information on assets is collected. On the PV Plant Holoby some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.

Have ideas to improve energo.ua?

Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.

In the system

1521

Assets

1332

Projects

4619

Companies

1A Sportyvna sq.,
Kyiv, 01001