Description of the power plant
Ground-based solar power plant PV Plant Hrandpauyer Lls 2 3 Phase is located in south part of Ukraine - Tokmatskyi district, Zaporizka region, Ukraine. The power plant is putted into operation on 2012 with installed capacity- 6.0 MW. Ltd Hrandpauyer Lls is a legal entity operating the power plant. It obtained the license for electricity generation on December 04, 2020 and permitted for the Feed-in-tariff in hryvnias equivalent of 24.56 eurocents starting from December 16, 2020.
Putted into opperation
Aug 2012
Installed capacity
6.0 MW
DCFeed-in-Tariff
24.56¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Hrandpauyer Lls 2 3 Phase?
- What group of companies does the PV Plant Hrandpauyer Lls 2 3 Phase belong to?
- Who are the beneficial owners of PV Plant Hrandpauyer Lls 2 3 Phase?
- What is the insolation at PV Plant Hrandpauyer Lls 2 3 Phase?
- What is the current tariff in UAH for PV Plant Hrandpauyer Lls 2 3 Phase?
- Is there a local component bonus for PV Plant Hrandpauyer Lls 2 3 Phase and what is its size
- What is the capacity factor of PV Plant Hrandpauyer Lls 2 3 Phase?
- What is the monthly electricity production of PV Plant Hrandpauyer Lls 2 3 Phase?
- What is the annual revenue of PV Plant Hrandpauyer Lls 2 3 Phase?
- What market share does PV Plant Hrandpauyer Lls 2 3 Phase have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Hrandpauyer Lls 2 3 Phase?
- Which company designed the project for PV Plant Hrandpauyer Lls 2 3 Phase?
- Which company was the general contractor for PV Plant Hrandpauyer Lls 2 3 Phase?
- What generating equipment (solar panels and inverters) is installed in PV Plant Hrandpauyer Lls 2 3 Phase?
- What is the size of the land plot on which PV Plant Hrandpauyer Lls 2 3 Phase is located?
- What are the cadastral numbers of the parcels on which PV Plant Hrandpauyer Lls 2 3 Phase is located?
- What are the exact coordinates of the location of PV Plant Hrandpauyer Lls 2 3 Phase?
- When were the grid connection specification forPV Plant Hrandpauyer Lls 2 3 Phase issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Hrandpauyer Lls 2 3 Phase
- Land allocation documentationPV Plant Hrandpauyer Lls 2 3 Phase
- Construction permits and declarative documentationPV Plant Hrandpauyer Lls 2 3 Phase
- Environmental Impact Assessment (EIA) DocumentsPV Plant Hrandpauyer Lls 2 3 Phase
- Feed-In-Tariff Setting DocumentsPV Plant Hrandpauyer Lls 2 3 Phase
The presented list reflects the directions in which information on assets is collected. On the PV Plant Hrandpauyer Lls 2 3 Phase some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.