Description of the power plant
Ground-based solar power plant PV Plant Khodoriv is located in west part of Ukraine - Zhydachivskyi district, Lvivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 4.21 MW. Ltd "Ntr" is a legal entity operating the power plant. It obtained the license for electricity generation on November 29, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from December 10, 2019.
Putted into opperation
Nov 2019
Installed capacity
4.21 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
PE "ART-ENERHO"General contractor
PE "ART-ENERHO"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Schneider Electric | Context CL 125 | |||
Schneider Electric | Context CL 125 | |||
Luxen Solar Energy | LNSE 325M |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Khodoriv?
- What group of companies does the PV Plant Khodoriv belong to?
- Who are the beneficial owners of PV Plant Khodoriv?
- What is the insolation at PV Plant Khodoriv?
- What is the current tariff in UAH for PV Plant Khodoriv?
- Is there a local component bonus for PV Plant Khodoriv and what is its size
- What is the capacity factor of PV Plant Khodoriv?
- What is the monthly electricity production of PV Plant Khodoriv?
- What is the annual revenue of PV Plant Khodoriv?
- What market share does PV Plant Khodoriv have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Khodoriv?
- Which company designed the project for PV Plant Khodoriv?
- Which company was the general contractor for PV Plant Khodoriv?
- What generating equipment (solar panels and inverters) is installed in PV Plant Khodoriv?
- What is the size of the land plot on which PV Plant Khodoriv is located?
- What are the cadastral numbers of the parcels on which PV Plant Khodoriv is located?
- What are the exact coordinates of the location of PV Plant Khodoriv?
- When were the grid connection specification forPV Plant Khodoriv issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Khodoriv
- Land allocation documentationPV Plant Khodoriv
- Construction permits and declarative documentationPV Plant Khodoriv
- Environmental Impact Assessment (EIA) DocumentsPV Plant Khodoriv
- Feed-In-Tariff Setting DocumentsPV Plant Khodoriv
The presented list reflects the directions in which information on assets is collected. On the PV Plant Khodoriv some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.