Description of the power plant
Ground-based solar power plant PV Plant Khryplyn 5 is located in west part of Ukraine - Ivano-Frankivska city council, Ivano-Frankivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 3.67 MW. Tov "Helios Hrupp "Khryplyn-5" is a legal entity operating the power plant. It obtained the license for electricity generation on December 20, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from December 24, 2019.
Putted into opperation
Dec 2019
Installed capacity
3.67 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "KMK ELEKTRO"General contractor
LTD "SOLAR STALKONSTRUKTSIYA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Khryplyn 5?
- What group of companies does the PV Plant Khryplyn 5 belong to?
- Who are the beneficial owners of PV Plant Khryplyn 5?
- What is the insolation at PV Plant Khryplyn 5?
- What is the current tariff in UAH for PV Plant Khryplyn 5?
- Is there a local component bonus for PV Plant Khryplyn 5 and what is its size
- What is the capacity factor of PV Plant Khryplyn 5?
- What is the monthly electricity production of PV Plant Khryplyn 5?
- What is the annual revenue of PV Plant Khryplyn 5?
- What market share does PV Plant Khryplyn 5 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Khryplyn 5?
- Which company designed the project for PV Plant Khryplyn 5?
- Which company was the general contractor for PV Plant Khryplyn 5?
- What generating equipment (solar panels and inverters) is installed in PV Plant Khryplyn 5?
- What is the size of the land plot on which PV Plant Khryplyn 5 is located?
- What are the cadastral numbers of the parcels on which PV Plant Khryplyn 5 is located?
- What are the exact coordinates of the location of PV Plant Khryplyn 5?
- When were the grid connection specification forPV Plant Khryplyn 5 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Khryplyn 5
- Land allocation documentationPV Plant Khryplyn 5
- Construction permits and declarative documentationPV Plant Khryplyn 5
- Environmental Impact Assessment (EIA) DocumentsPV Plant Khryplyn 5
- Feed-In-Tariff Setting DocumentsPV Plant Khryplyn 5
The presented list reflects the directions in which information on assets is collected. On the PV Plant Khryplyn 5 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.