Description of the power plant
Ground-based solar power plant PV Plant Klars Libertas is located in south part of Ukraine - Bratskyi district, Mykolaivska region, Ukraine. The power plant is putted into operation on 2021 with installed capacity- 0.24 MW. Tov "Klars "Libertas" is a legal entity operating the power plant. It obtained the license for electricity generation on March 31, 2021 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.61 eurocents starting from October 06, 2021.
Putted into opperation
Mar 2021
Installed capacity
0.24 MW
DCFeed-in-Tariff
10.61¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "AHROFON-PROEKT"General contractor
LTD "KLARS"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Klars Libertas?
- What group of companies does the PV Plant Klars Libertas belong to?
- Who are the beneficial owners of PV Plant Klars Libertas?
- What is the insolation at PV Plant Klars Libertas?
- What is the current tariff in UAH for PV Plant Klars Libertas?
- Is there a local component bonus for PV Plant Klars Libertas and what is its size
- What is the capacity factor of PV Plant Klars Libertas?
- What is the monthly electricity production of PV Plant Klars Libertas?
- What is the annual revenue of PV Plant Klars Libertas?
- What market share does PV Plant Klars Libertas have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Klars Libertas?
- Which company designed the project for PV Plant Klars Libertas?
- Which company was the general contractor for PV Plant Klars Libertas?
- What generating equipment (solar panels and inverters) is installed in PV Plant Klars Libertas?
- What is the size of the land plot on which PV Plant Klars Libertas is located?
- What are the cadastral numbers of the parcels on which PV Plant Klars Libertas is located?
- What are the exact coordinates of the location of PV Plant Klars Libertas?
- When were the grid connection specification forPV Plant Klars Libertas issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Klars Libertas
- Land allocation documentationPV Plant Klars Libertas
- Construction permits and declarative documentationPV Plant Klars Libertas
- Environmental Impact Assessment (EIA) DocumentsPV Plant Klars Libertas
- Feed-In-Tariff Setting DocumentsPV Plant Klars Libertas
The presented list reflects the directions in which information on assets is collected. On the PV Plant Klars Libertas some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.