Description of the power plant
Ground-based solar power plant PV Plant Komyshany 2 is located in south part of Ukraine - Khersonska city council, Khersonska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 4.82 MW. Ltd "Rendzhy Trostyanets" is a legal entity operating the power plant. It obtained the license for electricity generation on December 24, 2012 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from July 19, 2018.
Putted into opperation
May 2018
Installed capacity
4.82 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Komyshany 2?
- What group of companies does the PV Plant Komyshany 2 belong to?
- Who are the beneficial owners of PV Plant Komyshany 2?
- What is the insolation at PV Plant Komyshany 2?
- What is the current tariff in UAH for PV Plant Komyshany 2?
- Is there a local component bonus for PV Plant Komyshany 2 and what is its size
- What is the capacity factor of PV Plant Komyshany 2?
- What is the monthly electricity production of PV Plant Komyshany 2?
- What is the annual revenue of PV Plant Komyshany 2?
- What market share does PV Plant Komyshany 2 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Komyshany 2?
- Which company designed the project for PV Plant Komyshany 2?
- Which company was the general contractor for PV Plant Komyshany 2?
- What generating equipment (solar panels and inverters) is installed in PV Plant Komyshany 2?
- What is the size of the land plot on which PV Plant Komyshany 2 is located?
- What are the cadastral numbers of the parcels on which PV Plant Komyshany 2 is located?
- What are the exact coordinates of the location of PV Plant Komyshany 2?
- When were the grid connection specification forPV Plant Komyshany 2 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Komyshany 2
- Land allocation documentationPV Plant Komyshany 2
- Construction permits and declarative documentationPV Plant Komyshany 2
- Environmental Impact Assessment (EIA) DocumentsPV Plant Komyshany 2
- Feed-In-Tariff Setting DocumentsPV Plant Komyshany 2
The presented list reflects the directions in which information on assets is collected. On the PV Plant Komyshany 2 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.