Description of the power plant
Ground-based solar power plant PV Plant Kozliv 2 Stage is located in east part of Ukraine - Mohyliv-Podilskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 2.0 MW. Ltd "Imperial Enerho" is a legal entity operating the power plant. It obtained the license for electricity generation on October 20, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from January 14, 2020.
Putted into opperation
Dec 2019
Installed capacity
2.0 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "KPC ELEKTRYK"General contractor
LTD "KPC ELEKTRYK"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Kozliv 2 Stage?
- What group of companies does the PV Plant Kozliv 2 Stage belong to?
- Who are the beneficial owners of PV Plant Kozliv 2 Stage?
- What is the insolation at PV Plant Kozliv 2 Stage?
- What is the current tariff in UAH for PV Plant Kozliv 2 Stage?
- Is there a local component bonus for PV Plant Kozliv 2 Stage and what is its size
- What is the capacity factor of PV Plant Kozliv 2 Stage?
- What is the monthly electricity production of PV Plant Kozliv 2 Stage?
- What is the annual revenue of PV Plant Kozliv 2 Stage?
- What market share does PV Plant Kozliv 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Kozliv 2 Stage?
- Which company designed the project for PV Plant Kozliv 2 Stage?
- Which company was the general contractor for PV Plant Kozliv 2 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Kozliv 2 Stage?
- What is the size of the land plot on which PV Plant Kozliv 2 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Kozliv 2 Stage is located?
- What are the exact coordinates of the location of PV Plant Kozliv 2 Stage?
- When were the grid connection specification forPV Plant Kozliv 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Kozliv 2 Stage
- Land allocation documentationPV Plant Kozliv 2 Stage
- Construction permits and declarative documentationPV Plant Kozliv 2 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Kozliv 2 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Kozliv 2 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Kozliv 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.