Description of the power plant
Ground-based solar power plant PV Plant Kulykiv is located in west part of Ukraine - Zhovkivskyi district, Lvivska region, Ukraine. The power plant is putted into operation on 2020 with installed capacity- 3.43 MW. Ltd "Tm Partners" is a legal entity operating the power plant. It obtained the license for electricity generation on July 15, 2020 and permitted for the Feed-in-tariff in hryvnias equivalent of 11.26 eurocents starting from August 05, 2020.
Putted into opperation
Jul 2020
Installed capacity
3.43 MW
DCFeed-in-Tariff
11.26¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
General contractor
PE "ART-ENERHO"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Kehua Tech | SPI160K-B | |||
Trina Solar | TSM-375DE08M(II) | |||
Trina Solar | TSM-370DE08M(II) |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Kulykiv?
- What group of companies does the PV Plant Kulykiv belong to?
- Who are the beneficial owners of PV Plant Kulykiv?
- What is the insolation at PV Plant Kulykiv?
- What is the current tariff in UAH for PV Plant Kulykiv?
- Is there a local component bonus for PV Plant Kulykiv and what is its size
- What is the capacity factor of PV Plant Kulykiv?
- What is the monthly electricity production of PV Plant Kulykiv?
- What is the annual revenue of PV Plant Kulykiv?
- What market share does PV Plant Kulykiv have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Kulykiv?
- Which company designed the project for PV Plant Kulykiv?
- Which company was the general contractor for PV Plant Kulykiv?
- What generating equipment (solar panels and inverters) is installed in PV Plant Kulykiv?
- What is the size of the land plot on which PV Plant Kulykiv is located?
- What are the cadastral numbers of the parcels on which PV Plant Kulykiv is located?
- What are the exact coordinates of the location of PV Plant Kulykiv?
- When were the grid connection specification forPV Plant Kulykiv issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Kulykiv
- Land allocation documentationPV Plant Kulykiv
- Construction permits and declarative documentationPV Plant Kulykiv
- Environmental Impact Assessment (EIA) DocumentsPV Plant Kulykiv
- Feed-In-Tariff Setting DocumentsPV Plant Kulykiv
The presented list reflects the directions in which information on assets is collected. On the PV Plant Kulykiv some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.