Description of the power plant
Ground-based solar power plant PV Plant Layf Enerdzhi 2 Stage is located in east part of Ukraine - Kanivskyi district, Cherkaska region, Ukraine. The power plant is putted into operation on 2021 with installed capacity- 0.31 MW. Ltd "Layf Enerdzhi" is a legal entity operating the power plant. It obtained the license for electricity generation on December 03, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.61 eurocents starting from December 17, 2021.
Putted into opperation
Sep 2021
Installed capacity
0.31 MW
DCFeed-in-Tariff
10.61¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "ENERHOLYUKSMONTAZH"General contractor
LTD "ENERHOLYUKSMONTAZH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Layf Enerdzhi 2 Stage?
- What group of companies does the PV Plant Layf Enerdzhi 2 Stage belong to?
- Who are the beneficial owners of PV Plant Layf Enerdzhi 2 Stage?
- What is the insolation at PV Plant Layf Enerdzhi 2 Stage?
- What is the current tariff in UAH for PV Plant Layf Enerdzhi 2 Stage?
- Is there a local component bonus for PV Plant Layf Enerdzhi 2 Stage and what is its size
- What is the capacity factor of PV Plant Layf Enerdzhi 2 Stage?
- What is the monthly electricity production of PV Plant Layf Enerdzhi 2 Stage?
- What is the annual revenue of PV Plant Layf Enerdzhi 2 Stage?
- What market share does PV Plant Layf Enerdzhi 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Layf Enerdzhi 2 Stage?
- Which company designed the project for PV Plant Layf Enerdzhi 2 Stage?
- Which company was the general contractor for PV Plant Layf Enerdzhi 2 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Layf Enerdzhi 2 Stage?
- What is the size of the land plot on which PV Plant Layf Enerdzhi 2 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Layf Enerdzhi 2 Stage is located?
- What are the exact coordinates of the location of PV Plant Layf Enerdzhi 2 Stage?
- When were the grid connection specification forPV Plant Layf Enerdzhi 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Layf Enerdzhi 2 Stage
- Land allocation documentationPV Plant Layf Enerdzhi 2 Stage
- Construction permits and declarative documentationPV Plant Layf Enerdzhi 2 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Layf Enerdzhi 2 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Layf Enerdzhi 2 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Layf Enerdzhi 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.