Description of the power plant
Ground-based solar power plant PV Plant Lelyukhivka is located in east part of Ukraine - Novosanzharskyi district, Poltavska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 10.4 MW. Ltd "Sanvin 2" is a legal entity operating the power plant. It obtained the license for electricity generation on October 11, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from November 26, 2019.
Putted into opperation
Oct 2019
Installed capacity
10.4 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
KNESS | PVIS.1000 |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Lelyukhivka?
- What group of companies does the PV Plant Lelyukhivka belong to?
- Who are the beneficial owners of PV Plant Lelyukhivka?
- What is the insolation at PV Plant Lelyukhivka?
- What is the current tariff in UAH for PV Plant Lelyukhivka?
- Is there a local component bonus for PV Plant Lelyukhivka and what is its size
- What is the capacity factor of PV Plant Lelyukhivka?
- What is the monthly electricity production of PV Plant Lelyukhivka?
- What is the annual revenue of PV Plant Lelyukhivka?
- What market share does PV Plant Lelyukhivka have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Lelyukhivka?
- Which company designed the project for PV Plant Lelyukhivka?
- Which company was the general contractor for PV Plant Lelyukhivka?
- What generating equipment (solar panels and inverters) is installed in PV Plant Lelyukhivka?
- What is the size of the land plot on which PV Plant Lelyukhivka is located?
- What are the cadastral numbers of the parcels on which PV Plant Lelyukhivka is located?
- What are the exact coordinates of the location of PV Plant Lelyukhivka?
- When were the grid connection specification forPV Plant Lelyukhivka issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Lelyukhivka
- Land allocation documentationPV Plant Lelyukhivka
- Construction permits and declarative documentationPV Plant Lelyukhivka
- Environmental Impact Assessment (EIA) DocumentsPV Plant Lelyukhivka
- Feed-In-Tariff Setting DocumentsPV Plant Lelyukhivka
The presented list reflects the directions in which information on assets is collected. On the PV Plant Lelyukhivka some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.