Description of the power plant
Rooftop solar power plant PV Plant Mebleva 1 Stage is located in west part of Ukraine - Ivano-Frankivska city council, Ivano-Frankivska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 1.39 MW. Ltd "Hrin Enerdzhi Invest" is a legal entity operating the power plant. It obtained the license for electricity generation on July 24, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 16.37 eurocents starting from October 23, 2018.
Putted into opperation
Aug 2018
Installed capacity
1.39 MW
DCFeed-in-Tariff
16.37¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "RENTEKO"General contractor
LTD "RENTEKO"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Mebleva 1 Stage?
- What group of companies does the PV Plant Mebleva 1 Stage belong to?
- Who are the beneficial owners of PV Plant Mebleva 1 Stage?
- What is the insolation at PV Plant Mebleva 1 Stage?
- What is the current tariff in UAH for PV Plant Mebleva 1 Stage?
- Is there a local component bonus for PV Plant Mebleva 1 Stage and what is its size
- What is the capacity factor of PV Plant Mebleva 1 Stage?
- What is the monthly electricity production of PV Plant Mebleva 1 Stage?
- What is the annual revenue of PV Plant Mebleva 1 Stage?
- What market share does PV Plant Mebleva 1 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Mebleva 1 Stage?
- Which company designed the project for PV Plant Mebleva 1 Stage?
- Which company was the general contractor for PV Plant Mebleva 1 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Mebleva 1 Stage?
- What is the size of the land plot on which PV Plant Mebleva 1 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Mebleva 1 Stage is located?
- What are the exact coordinates of the location of PV Plant Mebleva 1 Stage?
- When were the grid connection specification forPV Plant Mebleva 1 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Mebleva 1 Stage
- Land allocation documentationPV Plant Mebleva 1 Stage
- Construction permits and declarative documentationPV Plant Mebleva 1 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Mebleva 1 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Mebleva 1 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Mebleva 1 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.