Description of the power plant
Ground-based solar power plant PV Plant Molodizhne is located in east part of Ukraine - Dolynskyi district, Kirovohradska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 4.95 MW. Ltd "Naukovo - Tekhnichnyy Tsentr Vidnovlyuvalnoyi Enerhetyky "Alternatyva" is a legal entity operating the power plant. It obtained the license for electricity generation on December 26, 2013 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from February 12, 2019.
Putted into opperation
Dec 2018
Installed capacity
4.95 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "SANNYVATT.UA"General contractor
LTD "ENERHOBUD-SPM"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Molodizhne?
- What group of companies does the PV Plant Molodizhne belong to?
- Who are the beneficial owners of PV Plant Molodizhne?
- What is the insolation at PV Plant Molodizhne?
- What is the current tariff in UAH for PV Plant Molodizhne?
- Is there a local component bonus for PV Plant Molodizhne and what is its size
- What is the capacity factor of PV Plant Molodizhne?
- What is the monthly electricity production of PV Plant Molodizhne?
- What is the annual revenue of PV Plant Molodizhne?
- What market share does PV Plant Molodizhne have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Molodizhne?
- Which company designed the project for PV Plant Molodizhne?
- Which company was the general contractor for PV Plant Molodizhne?
- What generating equipment (solar panels and inverters) is installed in PV Plant Molodizhne?
- What is the size of the land plot on which PV Plant Molodizhne is located?
- What are the cadastral numbers of the parcels on which PV Plant Molodizhne is located?
- What are the exact coordinates of the location of PV Plant Molodizhne?
- When were the grid connection specification forPV Plant Molodizhne issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Molodizhne
- Land allocation documentationPV Plant Molodizhne
- Construction permits and declarative documentationPV Plant Molodizhne
- Environmental Impact Assessment (EIA) DocumentsPV Plant Molodizhne
- Feed-In-Tariff Setting DocumentsPV Plant Molodizhne
The presented list reflects the directions in which information on assets is collected. On the PV Plant Molodizhne some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.