Description of the power plant
Ground-based solar power plant PV Plant Nemyryntsi is located in west part of Ukraine - Horodotskyi district, Khmelnytska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 4.23 MW. Ltd "Nemyryntsi Solar" is a legal entity operating the power plant. It obtained the license for electricity generation on April 02, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from May 28, 2019.
Putted into opperation
May 2019
Installed capacity
4.23 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "VOLTAZH HRUP"General contractor
LTD "VOLTAZH HRUP DZHENERAL"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Nemyryntsi?
- What group of companies does the PV Plant Nemyryntsi belong to?
- Who are the beneficial owners of PV Plant Nemyryntsi?
- What is the insolation at PV Plant Nemyryntsi?
- What is the current tariff in UAH for PV Plant Nemyryntsi?
- Is there a local component bonus for PV Plant Nemyryntsi and what is its size
- What is the capacity factor of PV Plant Nemyryntsi?
- What is the monthly electricity production of PV Plant Nemyryntsi?
- What is the annual revenue of PV Plant Nemyryntsi?
- What market share does PV Plant Nemyryntsi have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Nemyryntsi?
- Which company designed the project for PV Plant Nemyryntsi?
- Which company was the general contractor for PV Plant Nemyryntsi?
- What generating equipment (solar panels and inverters) is installed in PV Plant Nemyryntsi?
- What is the size of the land plot on which PV Plant Nemyryntsi is located?
- What are the cadastral numbers of the parcels on which PV Plant Nemyryntsi is located?
- What are the exact coordinates of the location of PV Plant Nemyryntsi?
- When were the grid connection specification forPV Plant Nemyryntsi issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Nemyryntsi
- Land allocation documentationPV Plant Nemyryntsi
- Construction permits and declarative documentationPV Plant Nemyryntsi
- Environmental Impact Assessment (EIA) DocumentsPV Plant Nemyryntsi
- Feed-In-Tariff Setting DocumentsPV Plant Nemyryntsi
The presented list reflects the directions in which information on assets is collected. On the PV Plant Nemyryntsi some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.