Description of the power plant
Ground-based solar power plant PV Plant Novooleksiyivka 1 is located in south part of Ukraine - Henicheskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2016 with installed capacity- 2.71 MW. Ltd "Velyton Solar" is a legal entity operating the power plant. It obtained the license for electricity generation on April 21, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.99 eurocents starting from May 05, 2016.
Putted into opperation
Apr 2016
Installed capacity
2.71 MW
DCFeed-in-Tariff
15.99¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "RENTEKHNO"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Novooleksiyivka 1?
- What group of companies does the PV Plant Novooleksiyivka 1 belong to?
- Who are the beneficial owners of PV Plant Novooleksiyivka 1?
- What is the insolation at PV Plant Novooleksiyivka 1?
- What is the current tariff in UAH for PV Plant Novooleksiyivka 1?
- Is there a local component bonus for PV Plant Novooleksiyivka 1 and what is its size
- What is the capacity factor of PV Plant Novooleksiyivka 1?
- What is the monthly electricity production of PV Plant Novooleksiyivka 1?
- What is the annual revenue of PV Plant Novooleksiyivka 1?
- What market share does PV Plant Novooleksiyivka 1 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Novooleksiyivka 1?
- Which company designed the project for PV Plant Novooleksiyivka 1?
- Which company was the general contractor for PV Plant Novooleksiyivka 1?
- What generating equipment (solar panels and inverters) is installed in PV Plant Novooleksiyivka 1?
- What is the size of the land plot on which PV Plant Novooleksiyivka 1 is located?
- What are the cadastral numbers of the parcels on which PV Plant Novooleksiyivka 1 is located?
- What are the exact coordinates of the location of PV Plant Novooleksiyivka 1?
- When were the grid connection specification forPV Plant Novooleksiyivka 1 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Novooleksiyivka 1
- Land allocation documentationPV Plant Novooleksiyivka 1
- Construction permits and declarative documentationPV Plant Novooleksiyivka 1
- Environmental Impact Assessment (EIA) DocumentsPV Plant Novooleksiyivka 1
- Feed-In-Tariff Setting DocumentsPV Plant Novooleksiyivka 1
The presented list reflects the directions in which information on assets is collected. On the PV Plant Novooleksiyivka 1 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.