Description of the power plant
Ground-based solar power plant PV Plant Novopetrivske is located in south part of Ukraine - Novoodeskyi district, Mykolaivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 12.85 MW. Ltd "Becc Solar" is a legal entity operating the power plant. It obtained the license for electricity generation on November 26, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from December 13, 2019.
Putted into opperation
Nov 2019
Installed capacity
12.85 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Jinko Solar | JKM-375M-72-V | |||
KNESS | PVCIS.2500 |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Novopetrivske?
- What group of companies does the PV Plant Novopetrivske belong to?
- Who are the beneficial owners of PV Plant Novopetrivske?
- What is the insolation at PV Plant Novopetrivske?
- What is the current tariff in UAH for PV Plant Novopetrivske?
- Is there a local component bonus for PV Plant Novopetrivske and what is its size
- What is the capacity factor of PV Plant Novopetrivske?
- What is the monthly electricity production of PV Plant Novopetrivske?
- What is the annual revenue of PV Plant Novopetrivske?
- What market share does PV Plant Novopetrivske have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Novopetrivske?
- Which company designed the project for PV Plant Novopetrivske?
- Which company was the general contractor for PV Plant Novopetrivske?
- What generating equipment (solar panels and inverters) is installed in PV Plant Novopetrivske?
- What is the size of the land plot on which PV Plant Novopetrivske is located?
- What are the cadastral numbers of the parcels on which PV Plant Novopetrivske is located?
- What are the exact coordinates of the location of PV Plant Novopetrivske?
- When were the grid connection specification forPV Plant Novopetrivske issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Novopetrivske
- Land allocation documentationPV Plant Novopetrivske
- Construction permits and declarative documentationPV Plant Novopetrivske
- Environmental Impact Assessment (EIA) DocumentsPV Plant Novopetrivske
- Feed-In-Tariff Setting DocumentsPV Plant Novopetrivske
The presented list reflects the directions in which information on assets is collected. On the PV Plant Novopetrivske some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.