Description of the power plant
Ground-based solar power plant PV Plant Oleshky 1 is located in south part of Ukraine - Oleshkivskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 21.76 MW. Ltd "Nyva Solar" is a legal entity operating the power plant. It obtained the license for electricity generation on June 14, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from June 26, 2018.
Putted into opperation
May 2018
Installed capacity
21.76 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Oleshky 1?
- What group of companies does the PV Plant Oleshky 1 belong to?
- Who are the beneficial owners of PV Plant Oleshky 1?
- What is the insolation at PV Plant Oleshky 1?
- What is the current tariff in UAH for PV Plant Oleshky 1?
- Is there a local component bonus for PV Plant Oleshky 1 and what is its size
- What is the capacity factor of PV Plant Oleshky 1?
- What is the monthly electricity production of PV Plant Oleshky 1?
- What is the annual revenue of PV Plant Oleshky 1?
- What market share does PV Plant Oleshky 1 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Oleshky 1?
- Which company designed the project for PV Plant Oleshky 1?
- Which company was the general contractor for PV Plant Oleshky 1?
- What generating equipment (solar panels and inverters) is installed in PV Plant Oleshky 1?
- What is the size of the land plot on which PV Plant Oleshky 1 is located?
- What are the cadastral numbers of the parcels on which PV Plant Oleshky 1 is located?
- What are the exact coordinates of the location of PV Plant Oleshky 1?
- When were the grid connection specification forPV Plant Oleshky 1 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Oleshky 1
- Land allocation documentationPV Plant Oleshky 1
- Construction permits and declarative documentationPV Plant Oleshky 1
- Environmental Impact Assessment (EIA) DocumentsPV Plant Oleshky 1
- Feed-In-Tariff Setting DocumentsPV Plant Oleshky 1
The presented list reflects the directions in which information on assets is collected. On the PV Plant Oleshky 1 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.