Description of the power plant
Ground-based solar power plant PV Plant Ordzhonikidze 2 Stage is located in east part of Ukraine - Ordzhonikidzevska city council, Dnipropetrovska region, Ukraine. The power plant is putted into operation on 2016 with installed capacity- 2.96 MW. Ltd "Solar Kvant" is a legal entity operating the power plant. It obtained the license for electricity generation on July 18, 2013 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.99 eurocents starting from February 14, 2017.
Putted into opperation
Dec 2016
Installed capacity
2.96 MW
DCFeed-in-Tariff
15.99¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
PE "INVEST-SERVIS"General contractor
LTD "ELIOS STRATEHIYA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Ordzhonikidze 2 Stage?
- What group of companies does the PV Plant Ordzhonikidze 2 Stage belong to?
- Who are the beneficial owners of PV Plant Ordzhonikidze 2 Stage?
- What is the insolation at PV Plant Ordzhonikidze 2 Stage?
- What is the current tariff in UAH for PV Plant Ordzhonikidze 2 Stage?
- Is there a local component bonus for PV Plant Ordzhonikidze 2 Stage and what is its size
- What is the capacity factor of PV Plant Ordzhonikidze 2 Stage?
- What is the monthly electricity production of PV Plant Ordzhonikidze 2 Stage?
- What is the annual revenue of PV Plant Ordzhonikidze 2 Stage?
- What market share does PV Plant Ordzhonikidze 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Ordzhonikidze 2 Stage?
- Which company designed the project for PV Plant Ordzhonikidze 2 Stage?
- Which company was the general contractor for PV Plant Ordzhonikidze 2 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Ordzhonikidze 2 Stage?
- What is the size of the land plot on which PV Plant Ordzhonikidze 2 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Ordzhonikidze 2 Stage is located?
- What are the exact coordinates of the location of PV Plant Ordzhonikidze 2 Stage?
- When were the grid connection specification forPV Plant Ordzhonikidze 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Ordzhonikidze 2 Stage
- Land allocation documentationPV Plant Ordzhonikidze 2 Stage
- Construction permits and declarative documentationPV Plant Ordzhonikidze 2 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Ordzhonikidze 2 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Ordzhonikidze 2 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Ordzhonikidze 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.