Description of the power plant
Ground-based solar power plant PV Plant Osnova Enerho 1 2 Stages is located in west part of Ukraine - Vynohradivskyi district, Zakarpatska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 6.02 MW. Ltd "Osnova Enerho" is a legal entity operating the power plant. It obtained the license for electricity generation on May 28, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from July 09, 2019.
Putted into opperation
Jun 2019
Installed capacity
6.02 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
SC "ENERHIYA" LTD "HRANDPROEKTBUD"General contractor
LTD "FES"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Osnova Enerho 1 2 Stages?
- What group of companies does the PV Plant Osnova Enerho 1 2 Stages belong to?
- Who are the beneficial owners of PV Plant Osnova Enerho 1 2 Stages?
- What is the insolation at PV Plant Osnova Enerho 1 2 Stages?
- What is the current tariff in UAH for PV Plant Osnova Enerho 1 2 Stages?
- Is there a local component bonus for PV Plant Osnova Enerho 1 2 Stages and what is its size
- What is the capacity factor of PV Plant Osnova Enerho 1 2 Stages?
- What is the monthly electricity production of PV Plant Osnova Enerho 1 2 Stages?
- What is the annual revenue of PV Plant Osnova Enerho 1 2 Stages?
- What market share does PV Plant Osnova Enerho 1 2 Stages have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Osnova Enerho 1 2 Stages?
- Which company designed the project for PV Plant Osnova Enerho 1 2 Stages?
- Which company was the general contractor for PV Plant Osnova Enerho 1 2 Stages?
- What generating equipment (solar panels and inverters) is installed in PV Plant Osnova Enerho 1 2 Stages?
- What is the size of the land plot on which PV Plant Osnova Enerho 1 2 Stages is located?
- What are the cadastral numbers of the parcels on which PV Plant Osnova Enerho 1 2 Stages is located?
- What are the exact coordinates of the location of PV Plant Osnova Enerho 1 2 Stages?
- When were the grid connection specification forPV Plant Osnova Enerho 1 2 Stages issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Osnova Enerho 1 2 Stages
- Land allocation documentationPV Plant Osnova Enerho 1 2 Stages
- Construction permits and declarative documentationPV Plant Osnova Enerho 1 2 Stages
- Environmental Impact Assessment (EIA) DocumentsPV Plant Osnova Enerho 1 2 Stages
- Feed-In-Tariff Setting DocumentsPV Plant Osnova Enerho 1 2 Stages
The presented list reflects the directions in which information on assets is collected. On the PV Plant Osnova Enerho 1 2 Stages some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.