Description of the power plant
Ground-based solar power plant PV Plant Partyzany is located in south part of Ukraine - Henicheskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 18.3 MW. Ltd "Fri-Enerdzhy Henichesk" is a legal entity operating the power plant. It obtained the license for electricity generation on August 07, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from October 30, 2018.
Putted into opperation
Sep 2018
Installed capacity
18.3 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "NESS KONSTRAKSHN"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Jinko Solar | JKM-280M-60 | |||
KNESS | PVIS.1000 | |||
Jinko Solar | JKM-280M-60 | |||
Jinko Solar | JKM-280M-60 |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Partyzany?
- What group of companies does the PV Plant Partyzany belong to?
- Who are the beneficial owners of PV Plant Partyzany?
- What is the insolation at PV Plant Partyzany?
- What is the current tariff in UAH for PV Plant Partyzany?
- Is there a local component bonus for PV Plant Partyzany and what is its size
- What is the capacity factor of PV Plant Partyzany?
- What is the monthly electricity production of PV Plant Partyzany?
- What is the annual revenue of PV Plant Partyzany?
- What market share does PV Plant Partyzany have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Partyzany?
- Which company designed the project for PV Plant Partyzany?
- Which company was the general contractor for PV Plant Partyzany?
- What generating equipment (solar panels and inverters) is installed in PV Plant Partyzany?
- What is the size of the land plot on which PV Plant Partyzany is located?
- What are the cadastral numbers of the parcels on which PV Plant Partyzany is located?
- What are the exact coordinates of the location of PV Plant Partyzany?
- When were the grid connection specification forPV Plant Partyzany issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Partyzany
- Land allocation documentationPV Plant Partyzany
- Construction permits and declarative documentationPV Plant Partyzany
- Environmental Impact Assessment (EIA) DocumentsPV Plant Partyzany
- Feed-In-Tariff Setting DocumentsPV Plant Partyzany
The presented list reflects the directions in which information on assets is collected. On the PV Plant Partyzany some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.