Description of the power plant
Ground-based solar power plant PV Plant Petropavlivka 1 Phase is located in south part of Ukraine - Zaporizkyi district, Zaporizka region, Ukraine. The power plant has installed capacity- 1.15 MW. Ltd "Sonyachni Standartni Rishennya" is a legal entity operating the power plant. It obtained the license for electricity generation on November 14, 2013 and permitted for the Feed-in-tariff in hryvnias equivalent of 33.93 eurocents starting from January 16, 2014.
Putted into opperation
N/A
Installed capacity
1.15 MW
DCFeed-in-Tariff
33.93¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Petropavlivka 1 Phase?
- What group of companies does the PV Plant Petropavlivka 1 Phase belong to?
- Who are the beneficial owners of PV Plant Petropavlivka 1 Phase?
- What is the insolation at PV Plant Petropavlivka 1 Phase?
- What is the current tariff in UAH for PV Plant Petropavlivka 1 Phase?
- Is there a local component bonus for PV Plant Petropavlivka 1 Phase and what is its size
- What is the capacity factor of PV Plant Petropavlivka 1 Phase?
- What is the monthly electricity production of PV Plant Petropavlivka 1 Phase?
- What is the annual revenue of PV Plant Petropavlivka 1 Phase?
- What market share does PV Plant Petropavlivka 1 Phase have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Petropavlivka 1 Phase?
- Which company designed the project for PV Plant Petropavlivka 1 Phase?
- Which company was the general contractor for PV Plant Petropavlivka 1 Phase?
- What generating equipment (solar panels and inverters) is installed in PV Plant Petropavlivka 1 Phase?
- What is the size of the land plot on which PV Plant Petropavlivka 1 Phase is located?
- What are the cadastral numbers of the parcels on which PV Plant Petropavlivka 1 Phase is located?
- What are the exact coordinates of the location of PV Plant Petropavlivka 1 Phase?
- When were the grid connection specification forPV Plant Petropavlivka 1 Phase issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Petropavlivka 1 Phase
- Land allocation documentationPV Plant Petropavlivka 1 Phase
- Construction permits and declarative documentationPV Plant Petropavlivka 1 Phase
- Environmental Impact Assessment (EIA) DocumentsPV Plant Petropavlivka 1 Phase
- Feed-In-Tariff Setting DocumentsPV Plant Petropavlivka 1 Phase
The presented list reflects the directions in which information on assets is collected. On the PV Plant Petropavlivka 1 Phase some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.