Description of the power plant
Ground-based solar power plant PV Plant Pidstepne Sontse 2 is located in south part of Ukraine - Oleshkivskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 3.04 MW. Ltd "Pidstepne Sontse" is a legal entity operating the power plant. It obtained the license for electricity generation on December 28, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from April 03, 2020.
Putted into opperation
Dec 2019
Installed capacity
3.04 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "HELIOS STRATEHIYA"General contractor
LTD "HELIOS STRATEHIYA"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Longi Solar | LR6-72PE-365M | |||
SMA | Sunny HighPower Peak 1 75-10 |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Pidstepne Sontse 2?
- What group of companies does the PV Plant Pidstepne Sontse 2 belong to?
- Who are the beneficial owners of PV Plant Pidstepne Sontse 2?
- What is the insolation at PV Plant Pidstepne Sontse 2?
- What is the current tariff in UAH for PV Plant Pidstepne Sontse 2?
- Is there a local component bonus for PV Plant Pidstepne Sontse 2 and what is its size
- What is the capacity factor of PV Plant Pidstepne Sontse 2?
- What is the monthly electricity production of PV Plant Pidstepne Sontse 2?
- What is the annual revenue of PV Plant Pidstepne Sontse 2?
- What market share does PV Plant Pidstepne Sontse 2 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Pidstepne Sontse 2?
- Which company designed the project for PV Plant Pidstepne Sontse 2?
- Which company was the general contractor for PV Plant Pidstepne Sontse 2?
- What generating equipment (solar panels and inverters) is installed in PV Plant Pidstepne Sontse 2?
- What is the size of the land plot on which PV Plant Pidstepne Sontse 2 is located?
- What are the cadastral numbers of the parcels on which PV Plant Pidstepne Sontse 2 is located?
- What are the exact coordinates of the location of PV Plant Pidstepne Sontse 2?
- When were the grid connection specification forPV Plant Pidstepne Sontse 2 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Pidstepne Sontse 2
- Land allocation documentationPV Plant Pidstepne Sontse 2
- Construction permits and declarative documentationPV Plant Pidstepne Sontse 2
- Environmental Impact Assessment (EIA) DocumentsPV Plant Pidstepne Sontse 2
- Feed-In-Tariff Setting DocumentsPV Plant Pidstepne Sontse 2
The presented list reflects the directions in which information on assets is collected. On the PV Plant Pidstepne Sontse 2 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.