Description of the power plant
Ground-based solar power plant PV Plant Popelnyky is located in west part of Ukraine - Sniatynskyi district, Ivano-Frankivska region, Ukraine. The power plant is putted into operation on 2016 with installed capacity- 4.13 MW. Ltd "Solar Karpaty" is a legal entity operating the power plant. It obtained the license for electricity generation on October 13, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.99 eurocents starting from November 07, 2016.
Putted into opperation
Sep 2016
Installed capacity
4.13 MW
DCFeed-in-Tariff
15.99¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "ARKHITEKTURNE BYURO "NEF"General contractor
LTD "SOLAR KARPATY"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Popelnyky?
- What group of companies does the PV Plant Popelnyky belong to?
- Who are the beneficial owners of PV Plant Popelnyky?
- What is the insolation at PV Plant Popelnyky?
- What is the current tariff in UAH for PV Plant Popelnyky?
- Is there a local component bonus for PV Plant Popelnyky and what is its size
- What is the capacity factor of PV Plant Popelnyky?
- What is the monthly electricity production of PV Plant Popelnyky?
- What is the annual revenue of PV Plant Popelnyky?
- What market share does PV Plant Popelnyky have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Popelnyky?
- Which company designed the project for PV Plant Popelnyky?
- Which company was the general contractor for PV Plant Popelnyky?
- What generating equipment (solar panels and inverters) is installed in PV Plant Popelnyky?
- What is the size of the land plot on which PV Plant Popelnyky is located?
- What are the cadastral numbers of the parcels on which PV Plant Popelnyky is located?
- What are the exact coordinates of the location of PV Plant Popelnyky?
- When were the grid connection specification forPV Plant Popelnyky issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Popelnyky
- Land allocation documentationPV Plant Popelnyky
- Construction permits and declarative documentationPV Plant Popelnyky
- Environmental Impact Assessment (EIA) DocumentsPV Plant Popelnyky
- Feed-In-Tariff Setting DocumentsPV Plant Popelnyky
The presented list reflects the directions in which information on assets is collected. On the PV Plant Popelnyky some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.