Description of the power plant
Ground-based solar power plant PV Plant Rodnykivka is located in east part of Ukraine - Umanskyi district, Cherkaska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 0.52 MW. Ltd "Eko Sezar" is a legal entity operating the power plant. It obtained the license for electricity generation on July 10, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from February 12, 2019.
Putted into opperation
Dec 2018
Installed capacity
0.52 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "HETMAN BRAZER’S HRUP"General contractor
LTD "HETMAN BRAZER’S HRUP"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Rodnykivka?
- What group of companies does the PV Plant Rodnykivka belong to?
- Who are the beneficial owners of PV Plant Rodnykivka?
- What is the insolation at PV Plant Rodnykivka?
- What is the current tariff in UAH for PV Plant Rodnykivka?
- Is there a local component bonus for PV Plant Rodnykivka and what is its size
- What is the capacity factor of PV Plant Rodnykivka?
- What is the monthly electricity production of PV Plant Rodnykivka?
- What is the annual revenue of PV Plant Rodnykivka?
- What market share does PV Plant Rodnykivka have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Rodnykivka?
- Which company designed the project for PV Plant Rodnykivka?
- Which company was the general contractor for PV Plant Rodnykivka?
- What generating equipment (solar panels and inverters) is installed in PV Plant Rodnykivka?
- What is the size of the land plot on which PV Plant Rodnykivka is located?
- What are the cadastral numbers of the parcels on which PV Plant Rodnykivka is located?
- What are the exact coordinates of the location of PV Plant Rodnykivka?
- When were the grid connection specification forPV Plant Rodnykivka issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Rodnykivka
- Land allocation documentationPV Plant Rodnykivka
- Construction permits and declarative documentationPV Plant Rodnykivka
- Environmental Impact Assessment (EIA) DocumentsPV Plant Rodnykivka
- Feed-In-Tariff Setting DocumentsPV Plant Rodnykivka
The presented list reflects the directions in which information on assets is collected. On the PV Plant Rodnykivka some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.