Description of the power plant
Ground-based solar power plant PV Plant Rubanivka is located in south part of Ukraine - Velykolepetyskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 19.98 MW. Ltd "Nyva Enerho" is a legal entity operating the power plant. It obtained the license for electricity generation on October 06, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from December 27, 2017.
Putted into opperation
Oct 2017
Installed capacity
19.98 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Rubanivka?
- What group of companies does the PV Plant Rubanivka belong to?
- Who are the beneficial owners of PV Plant Rubanivka?
- What is the insolation at PV Plant Rubanivka?
- What is the current tariff in UAH for PV Plant Rubanivka?
- Is there a local component bonus for PV Plant Rubanivka and what is its size
- What is the capacity factor of PV Plant Rubanivka?
- What is the monthly electricity production of PV Plant Rubanivka?
- What is the annual revenue of PV Plant Rubanivka?
- What market share does PV Plant Rubanivka have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Rubanivka?
- Which company designed the project for PV Plant Rubanivka?
- Which company was the general contractor for PV Plant Rubanivka?
- What generating equipment (solar panels and inverters) is installed in PV Plant Rubanivka?
- What is the size of the land plot on which PV Plant Rubanivka is located?
- What are the cadastral numbers of the parcels on which PV Plant Rubanivka is located?
- What are the exact coordinates of the location of PV Plant Rubanivka?
- When were the grid connection specification forPV Plant Rubanivka issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Rubanivka
- Land allocation documentationPV Plant Rubanivka
- Construction permits and declarative documentationPV Plant Rubanivka
- Environmental Impact Assessment (EIA) DocumentsPV Plant Rubanivka
- Feed-In-Tariff Setting DocumentsPV Plant Rubanivka
The presented list reflects the directions in which information on assets is collected. On the PV Plant Rubanivka some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.