Description of the power plant
Ground-based solar power plant PV Plant San Enerdzhi Mezhyrich is located in east part of Ukraine - Pavlohradskyi district, Dnipropetrovska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 2.34 MW. Ltd "San Enerdzhi". is a legal entity operating the power plant. It obtained the license for electricity generation on May 12, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from November 06, 2018.
From August 2019 PV Plant San Enerdzhi Mezhyrich was changed to PV Plant San Enerdzhi Mezhyrich 1 Stage
Putted into opperation
Oct 2018
Installed capacity
2.34 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "EDS-INZHYNIRYNH"General contractor
LTD "EDS-INZHYNIRYNH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant San Enerdzhi Mezhyrich?
- What group of companies does the PV Plant San Enerdzhi Mezhyrich belong to?
- Who are the beneficial owners of PV Plant San Enerdzhi Mezhyrich?
- What is the insolation at PV Plant San Enerdzhi Mezhyrich?
- What is the current tariff in UAH for PV Plant San Enerdzhi Mezhyrich?
- Is there a local component bonus for PV Plant San Enerdzhi Mezhyrich and what is its size
- What is the capacity factor of PV Plant San Enerdzhi Mezhyrich?
- What is the monthly electricity production of PV Plant San Enerdzhi Mezhyrich?
- What is the annual revenue of PV Plant San Enerdzhi Mezhyrich?
- What market share does PV Plant San Enerdzhi Mezhyrich have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant San Enerdzhi Mezhyrich?
- Which company designed the project for PV Plant San Enerdzhi Mezhyrich?
- Which company was the general contractor for PV Plant San Enerdzhi Mezhyrich?
- What generating equipment (solar panels and inverters) is installed in PV Plant San Enerdzhi Mezhyrich?
- What is the size of the land plot on which PV Plant San Enerdzhi Mezhyrich is located?
- What are the cadastral numbers of the parcels on which PV Plant San Enerdzhi Mezhyrich is located?
- What are the exact coordinates of the location of PV Plant San Enerdzhi Mezhyrich?
- When were the grid connection specification forPV Plant San Enerdzhi Mezhyrich issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant San Enerdzhi Mezhyrich
- Land allocation documentationPV Plant San Enerdzhi Mezhyrich
- Construction permits and declarative documentationPV Plant San Enerdzhi Mezhyrich
- Environmental Impact Assessment (EIA) DocumentsPV Plant San Enerdzhi Mezhyrich
- Feed-In-Tariff Setting DocumentsPV Plant San Enerdzhi Mezhyrich
The presented list reflects the directions in which information on assets is collected. On the PV Plant San Enerdzhi Mezhyrich some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.