Description of the power plant
Ground-based solar power plant PV Plant Sanlayt Enerdzhi 2 is located in south part of Ukraine - Arbuzynskyi district, Mykolaivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 6.0 MW. Ltd "Sanlayt Enerdzhi 2" is a legal entity operating the power plant. It obtained the license for electricity generation on July 25, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from August 23, 2019.
Putted into opperation
Aug 2019
Installed capacity
6.0 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "ELIOS STRATEHIYA"General contractor
LTD "ELIOS STRATEHIYA"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Trina Solar | TSM275PD05 | |||
SMA | Sunny HighPower Peak 1 75-10 |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Sanlayt Enerdzhi 2?
- What group of companies does the PV Plant Sanlayt Enerdzhi 2 belong to?
- Who are the beneficial owners of PV Plant Sanlayt Enerdzhi 2?
- What is the insolation at PV Plant Sanlayt Enerdzhi 2?
- What is the current tariff in UAH for PV Plant Sanlayt Enerdzhi 2?
- Is there a local component bonus for PV Plant Sanlayt Enerdzhi 2 and what is its size
- What is the capacity factor of PV Plant Sanlayt Enerdzhi 2?
- What is the monthly electricity production of PV Plant Sanlayt Enerdzhi 2?
- What is the annual revenue of PV Plant Sanlayt Enerdzhi 2?
- What market share does PV Plant Sanlayt Enerdzhi 2 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Sanlayt Enerdzhi 2?
- Which company designed the project for PV Plant Sanlayt Enerdzhi 2?
- Which company was the general contractor for PV Plant Sanlayt Enerdzhi 2?
- What generating equipment (solar panels and inverters) is installed in PV Plant Sanlayt Enerdzhi 2?
- What is the size of the land plot on which PV Plant Sanlayt Enerdzhi 2 is located?
- What are the cadastral numbers of the parcels on which PV Plant Sanlayt Enerdzhi 2 is located?
- What are the exact coordinates of the location of PV Plant Sanlayt Enerdzhi 2?
- When were the grid connection specification forPV Plant Sanlayt Enerdzhi 2 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Sanlayt Enerdzhi 2
- Land allocation documentationPV Plant Sanlayt Enerdzhi 2
- Construction permits and declarative documentationPV Plant Sanlayt Enerdzhi 2
- Environmental Impact Assessment (EIA) DocumentsPV Plant Sanlayt Enerdzhi 2
- Feed-In-Tariff Setting DocumentsPV Plant Sanlayt Enerdzhi 2
The presented list reflects the directions in which information on assets is collected. On the PV Plant Sanlayt Enerdzhi 2 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.