Description of the power plant
Ground-based solar power plant PV Plant Solar Chornobyl 1 is located in north part of Ukraine - Ivankivskyi district, Kyivska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 1.0 MW. Ltd "Solar Chornobyl" is a legal entity operating the power plant. It obtained the license for electricity generation on February 09, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from June 26, 2018.
Putted into opperation
May 2018
Installed capacity
1.0 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "RODYNA ERS"General contractor
LTD "RODYNA ERS"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Solar Chornobyl 1?
- What group of companies does the PV Plant Solar Chornobyl 1 belong to?
- Who are the beneficial owners of PV Plant Solar Chornobyl 1?
- What is the insolation at PV Plant Solar Chornobyl 1?
- What is the current tariff in UAH for PV Plant Solar Chornobyl 1?
- Is there a local component bonus for PV Plant Solar Chornobyl 1 and what is its size
- What is the capacity factor of PV Plant Solar Chornobyl 1?
- What is the monthly electricity production of PV Plant Solar Chornobyl 1?
- What is the annual revenue of PV Plant Solar Chornobyl 1?
- What market share does PV Plant Solar Chornobyl 1 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Solar Chornobyl 1?
- Which company designed the project for PV Plant Solar Chornobyl 1?
- Which company was the general contractor for PV Plant Solar Chornobyl 1?
- What generating equipment (solar panels and inverters) is installed in PV Plant Solar Chornobyl 1?
- What is the size of the land plot on which PV Plant Solar Chornobyl 1 is located?
- What are the cadastral numbers of the parcels on which PV Plant Solar Chornobyl 1 is located?
- What are the exact coordinates of the location of PV Plant Solar Chornobyl 1?
- When were the grid connection specification forPV Plant Solar Chornobyl 1 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Solar Chornobyl 1
- Land allocation documentationPV Plant Solar Chornobyl 1
- Construction permits and declarative documentationPV Plant Solar Chornobyl 1
- Environmental Impact Assessment (EIA) DocumentsPV Plant Solar Chornobyl 1
- Feed-In-Tariff Setting DocumentsPV Plant Solar Chornobyl 1
The presented list reflects the directions in which information on assets is collected. On the PV Plant Solar Chornobyl 1 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.