Description of the power plant
Ground-based solar power plant PV Plant Solar Enerdzhi If is located in west part of Ukraine - Rozhniativskyi district, Ivano-Frankivska region, Ukraine. The power plant is putted into operation on 2020 with installed capacity- 6.16 MW. Ltd "Solar Enerdzhi If" is a legal entity operating the power plant. It obtained the license for electricity generation on December 30, 2020 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.97 eurocents starting from January 27, 2021.
Putted into opperation
Oct 2020
Installed capacity
6.16 MW
DCFeed-in-Tariff
10.97¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "ELEKTRIK HRUP"General contractor
LTD "ELEKTRIK HRUP"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Solar Enerdzhi If?
- What group of companies does the PV Plant Solar Enerdzhi If belong to?
- Who are the beneficial owners of PV Plant Solar Enerdzhi If?
- What is the insolation at PV Plant Solar Enerdzhi If?
- What is the current tariff in UAH for PV Plant Solar Enerdzhi If?
- Is there a local component bonus for PV Plant Solar Enerdzhi If and what is its size
- What is the capacity factor of PV Plant Solar Enerdzhi If?
- What is the monthly electricity production of PV Plant Solar Enerdzhi If?
- What is the annual revenue of PV Plant Solar Enerdzhi If?
- What market share does PV Plant Solar Enerdzhi If have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Solar Enerdzhi If?
- Which company designed the project for PV Plant Solar Enerdzhi If?
- Which company was the general contractor for PV Plant Solar Enerdzhi If?
- What generating equipment (solar panels and inverters) is installed in PV Plant Solar Enerdzhi If?
- What is the size of the land plot on which PV Plant Solar Enerdzhi If is located?
- What are the cadastral numbers of the parcels on which PV Plant Solar Enerdzhi If is located?
- What are the exact coordinates of the location of PV Plant Solar Enerdzhi If?
- When were the grid connection specification forPV Plant Solar Enerdzhi If issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Solar Enerdzhi If
- Land allocation documentationPV Plant Solar Enerdzhi If
- Construction permits and declarative documentationPV Plant Solar Enerdzhi If
- Environmental Impact Assessment (EIA) DocumentsPV Plant Solar Enerdzhi If
- Feed-In-Tariff Setting DocumentsPV Plant Solar Enerdzhi If
The presented list reflects the directions in which information on assets is collected. On the PV Plant Solar Enerdzhi If some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.