Description of the power plant
Ground-based solar power plant PV Plant Solar Strim is located in west part of Ukraine - Chemerovetskyi district, Khmelnytska region, Ukraine. The power plant is putted into operation on 2020 with installed capacity- 5.91 MW. Ltd "Solar Strim" is a legal entity operating the power plant. It obtained the license for electricity generation on June 09, 2021 and permitted for the Feed-in-tariff in hryvnias equivalent of 7.88 eurocents starting from June 16, 2021.
Putted into opperation
Nov 2020
Installed capacity
5.91 MW
DCFeed-in-Tariff
7.88¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "VOLTAZH HRUP"General contractor
LTD "ZMK-1"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Solar Strim?
- What group of companies does the PV Plant Solar Strim belong to?
- Who are the beneficial owners of PV Plant Solar Strim?
- What is the insolation at PV Plant Solar Strim?
- What is the current tariff in UAH for PV Plant Solar Strim?
- Is there a local component bonus for PV Plant Solar Strim and what is its size
- What is the capacity factor of PV Plant Solar Strim?
- What is the monthly electricity production of PV Plant Solar Strim?
- What is the annual revenue of PV Plant Solar Strim?
- What market share does PV Plant Solar Strim have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Solar Strim?
- Which company designed the project for PV Plant Solar Strim?
- Which company was the general contractor for PV Plant Solar Strim?
- What generating equipment (solar panels and inverters) is installed in PV Plant Solar Strim?
- What is the size of the land plot on which PV Plant Solar Strim is located?
- What are the cadastral numbers of the parcels on which PV Plant Solar Strim is located?
- What are the exact coordinates of the location of PV Plant Solar Strim?
- When were the grid connection specification forPV Plant Solar Strim issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Solar Strim
- Land allocation documentationPV Plant Solar Strim
- Construction permits and declarative documentationPV Plant Solar Strim
- Environmental Impact Assessment (EIA) DocumentsPV Plant Solar Strim
- Feed-In-Tariff Setting DocumentsPV Plant Solar Strim
The presented list reflects the directions in which information on assets is collected. On the PV Plant Solar Strim some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.