Description of the power plant
Ground-based solar power plant PV Plant Stanislavskyy Pravnyk is located in west part of Ukraine - Kolomyiskyi district, Ivano-Frankivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 1.2 MW. Ltd "Stanislavskyy Pravnyk" is a legal entity operating the power plant. It obtained the license for electricity generation on October 24, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from November 14, 2019.
Putted into opperation
Oct 2019
Installed capacity
1.2 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "STEM SOLAR"General contractor
LTD "STEM SOLAR"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Stanislavskyy Pravnyk?
- What group of companies does the PV Plant Stanislavskyy Pravnyk belong to?
- Who are the beneficial owners of PV Plant Stanislavskyy Pravnyk?
- What is the insolation at PV Plant Stanislavskyy Pravnyk?
- What is the current tariff in UAH for PV Plant Stanislavskyy Pravnyk?
- Is there a local component bonus for PV Plant Stanislavskyy Pravnyk and what is its size
- What is the capacity factor of PV Plant Stanislavskyy Pravnyk?
- What is the monthly electricity production of PV Plant Stanislavskyy Pravnyk?
- What is the annual revenue of PV Plant Stanislavskyy Pravnyk?
- What market share does PV Plant Stanislavskyy Pravnyk have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Stanislavskyy Pravnyk?
- Which company designed the project for PV Plant Stanislavskyy Pravnyk?
- Which company was the general contractor for PV Plant Stanislavskyy Pravnyk?
- What generating equipment (solar panels and inverters) is installed in PV Plant Stanislavskyy Pravnyk?
- What is the size of the land plot on which PV Plant Stanislavskyy Pravnyk is located?
- What are the cadastral numbers of the parcels on which PV Plant Stanislavskyy Pravnyk is located?
- What are the exact coordinates of the location of PV Plant Stanislavskyy Pravnyk?
- When were the grid connection specification forPV Plant Stanislavskyy Pravnyk issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Stanislavskyy Pravnyk
- Land allocation documentationPV Plant Stanislavskyy Pravnyk
- Construction permits and declarative documentationPV Plant Stanislavskyy Pravnyk
- Environmental Impact Assessment (EIA) DocumentsPV Plant Stanislavskyy Pravnyk
- Feed-In-Tariff Setting DocumentsPV Plant Stanislavskyy Pravnyk
The presented list reflects the directions in which information on assets is collected. On the PV Plant Stanislavskyy Pravnyk some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.