Description of the power plant
Ground-based solar power plant PV Plant Stepnohirsk 2 Stage is located in south part of Ukraine - Vasylivskyi district, Zaporizka region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 8.88 MW. Ltd "Rendzhy Zaporizhzhya" is a legal entity operating the power plant. It obtained the license for electricity generation on June 07, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from December 20, 2019.
Putted into opperation
Sep 2019
Installed capacity
8.88 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "ENERHO - SYLA"General contractor
LTD "ENERHO - SYLA"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Electrim-2000 | КТПБ 1150-2500/0/0,42/36,75-У1 | |||
Electrim-2000 | КТПБ 2x1075-2500/0/0,42/36,75- У1 |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Stepnohirsk 2 Stage?
- What group of companies does the PV Plant Stepnohirsk 2 Stage belong to?
- Who are the beneficial owners of PV Plant Stepnohirsk 2 Stage?
- What is the insolation at PV Plant Stepnohirsk 2 Stage?
- What is the current tariff in UAH for PV Plant Stepnohirsk 2 Stage?
- Is there a local component bonus for PV Plant Stepnohirsk 2 Stage and what is its size
- What is the capacity factor of PV Plant Stepnohirsk 2 Stage?
- What is the monthly electricity production of PV Plant Stepnohirsk 2 Stage?
- What is the annual revenue of PV Plant Stepnohirsk 2 Stage?
- What market share does PV Plant Stepnohirsk 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Stepnohirsk 2 Stage?
- Which company designed the project for PV Plant Stepnohirsk 2 Stage?
- Which company was the general contractor for PV Plant Stepnohirsk 2 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Stepnohirsk 2 Stage?
- What is the size of the land plot on which PV Plant Stepnohirsk 2 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Stepnohirsk 2 Stage is located?
- What are the exact coordinates of the location of PV Plant Stepnohirsk 2 Stage?
- When were the grid connection specification forPV Plant Stepnohirsk 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Stepnohirsk 2 Stage
- Land allocation documentationPV Plant Stepnohirsk 2 Stage
- Construction permits and declarative documentationPV Plant Stepnohirsk 2 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Stepnohirsk 2 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Stepnohirsk 2 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Stepnohirsk 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.