Description of the power plant
Ground-based solar power plant PV Plant Strabychovo 2 is located in west part of Ukraine - Mukachivskyi district, Zakarpatska region, Ukraine. The power plant is putted into operation on 2020 with installed capacity- 5.69 MW. Ltd "Fes Strabychovo 2" is a legal entity operating the power plant. It obtained the license for electricity generation on July 29, 2020 and permitted for the Feed-in-tariff in hryvnias equivalent of 11.26 eurocents starting from August 12, 2020.
Putted into opperation
Jul 2020
Installed capacity
5.69 MW
DCFeed-in-Tariff
11.26¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
SC "ENERHIYA" LTD "HRANDPROEKTBUD"General contractor
LTD "FES"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Strabychovo 2?
- What group of companies does the PV Plant Strabychovo 2 belong to?
- Who are the beneficial owners of PV Plant Strabychovo 2?
- What is the insolation at PV Plant Strabychovo 2?
- What is the current tariff in UAH for PV Plant Strabychovo 2?
- Is there a local component bonus for PV Plant Strabychovo 2 and what is its size
- What is the capacity factor of PV Plant Strabychovo 2?
- What is the monthly electricity production of PV Plant Strabychovo 2?
- What is the annual revenue of PV Plant Strabychovo 2?
- What market share does PV Plant Strabychovo 2 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Strabychovo 2?
- Which company designed the project for PV Plant Strabychovo 2?
- Which company was the general contractor for PV Plant Strabychovo 2?
- What generating equipment (solar panels and inverters) is installed in PV Plant Strabychovo 2?
- What is the size of the land plot on which PV Plant Strabychovo 2 is located?
- What are the cadastral numbers of the parcels on which PV Plant Strabychovo 2 is located?
- What are the exact coordinates of the location of PV Plant Strabychovo 2?
- When were the grid connection specification forPV Plant Strabychovo 2 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Strabychovo 2
- Land allocation documentationPV Plant Strabychovo 2
- Construction permits and declarative documentationPV Plant Strabychovo 2
- Environmental Impact Assessment (EIA) DocumentsPV Plant Strabychovo 2
- Feed-In-Tariff Setting DocumentsPV Plant Strabychovo 2
The presented list reflects the directions in which information on assets is collected. On the PV Plant Strabychovo 2 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.