Description of the power plant
Ground-based solar power plant PV Plant Taborivka is located in south part of Ukraine - Voznesenskyi district, Mykolaivska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 16.9 MW. Ltd "Starvoyt" is a legal entity operating the power plant. It obtained the license for electricity generation on December 11, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from January 29, 2019.
Putted into opperation
Dec 2018
Installed capacity
16.9 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Taborivka?
- What group of companies does the PV Plant Taborivka belong to?
- Who are the beneficial owners of PV Plant Taborivka?
- What is the insolation at PV Plant Taborivka?
- What is the current tariff in UAH for PV Plant Taborivka?
- Is there a local component bonus for PV Plant Taborivka and what is its size
- What is the capacity factor of PV Plant Taborivka?
- What is the monthly electricity production of PV Plant Taborivka?
- What is the annual revenue of PV Plant Taborivka?
- What market share does PV Plant Taborivka have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Taborivka?
- Which company designed the project for PV Plant Taborivka?
- Which company was the general contractor for PV Plant Taborivka?
- What generating equipment (solar panels and inverters) is installed in PV Plant Taborivka?
- What is the size of the land plot on which PV Plant Taborivka is located?
- What are the cadastral numbers of the parcels on which PV Plant Taborivka is located?
- What are the exact coordinates of the location of PV Plant Taborivka?
- When were the grid connection specification forPV Plant Taborivka issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Taborivka
- Land allocation documentationPV Plant Taborivka
- Construction permits and declarative documentationPV Plant Taborivka
- Environmental Impact Assessment (EIA) DocumentsPV Plant Taborivka
- Feed-In-Tariff Setting DocumentsPV Plant Taborivka
The presented list reflects the directions in which information on assets is collected. On the PV Plant Taborivka some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.