Description of the power plant
Ground-based solar power plant PV Plant Ternovytsya 1 And 3 is located in west part of Ukraine - Yavorivskyi district, Lvivska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 5.8 MW. Ltd "Enerhopostach-Plyus" is a legal entity operating the power plant. It obtained the license for electricity generation on June 16, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from June 26, 2018.
Putted into opperation
Mar 2018
Installed capacity
5.8 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "LEOPOLIS-PLYUS"General contractor
LTD "KRAMALYANS"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Ternovytsya 1 And 3?
- What group of companies does the PV Plant Ternovytsya 1 And 3 belong to?
- Who are the beneficial owners of PV Plant Ternovytsya 1 And 3?
- What is the insolation at PV Plant Ternovytsya 1 And 3?
- What is the current tariff in UAH for PV Plant Ternovytsya 1 And 3?
- Is there a local component bonus for PV Plant Ternovytsya 1 And 3 and what is its size
- What is the capacity factor of PV Plant Ternovytsya 1 And 3?
- What is the monthly electricity production of PV Plant Ternovytsya 1 And 3?
- What is the annual revenue of PV Plant Ternovytsya 1 And 3?
- What market share does PV Plant Ternovytsya 1 And 3 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Ternovytsya 1 And 3?
- Which company designed the project for PV Plant Ternovytsya 1 And 3?
- Which company was the general contractor for PV Plant Ternovytsya 1 And 3?
- What generating equipment (solar panels and inverters) is installed in PV Plant Ternovytsya 1 And 3?
- What is the size of the land plot on which PV Plant Ternovytsya 1 And 3 is located?
- What are the cadastral numbers of the parcels on which PV Plant Ternovytsya 1 And 3 is located?
- What are the exact coordinates of the location of PV Plant Ternovytsya 1 And 3?
- When were the grid connection specification forPV Plant Ternovytsya 1 And 3 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Ternovytsya 1 And 3
- Land allocation documentationPV Plant Ternovytsya 1 And 3
- Construction permits and declarative documentationPV Plant Ternovytsya 1 And 3
- Environmental Impact Assessment (EIA) DocumentsPV Plant Ternovytsya 1 And 3
- Feed-In-Tariff Setting DocumentsPV Plant Ternovytsya 1 And 3
The presented list reflects the directions in which information on assets is collected. On the PV Plant Ternovytsya 1 And 3 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.