Description of the power plant
Ground-based solar power plant PV Plant Tokmak Solar 3 Phase is located in south part of Ukraine - Tokmatska city council, Zaporizka region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 5.45 MW. Ltd "Tokmak Solar Enerdzhi" is a legal entity operating the power plant. It obtained the license for electricity generation on September 20, 2012 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from January 11, 2018.
From April 2020 PV Plant Tokmak Solar 3 Phase was changed to PV Plant Hrin Enerdzhi Tokmak
Putted into opperation
Aug 2017
Installed capacity
5.45 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "VHPI"General contractor
LTD "LIATEK"Equipment
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Tokmak Solar 3 Phase?
- What group of companies does the PV Plant Tokmak Solar 3 Phase belong to?
- Who are the beneficial owners of PV Plant Tokmak Solar 3 Phase?
- What is the insolation at PV Plant Tokmak Solar 3 Phase?
- What is the current tariff in UAH for PV Plant Tokmak Solar 3 Phase?
- Is there a local component bonus for PV Plant Tokmak Solar 3 Phase and what is its size
- What is the capacity factor of PV Plant Tokmak Solar 3 Phase?
- What is the monthly electricity production of PV Plant Tokmak Solar 3 Phase?
- What is the annual revenue of PV Plant Tokmak Solar 3 Phase?
- What market share does PV Plant Tokmak Solar 3 Phase have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Tokmak Solar 3 Phase?
- Which company designed the project for PV Plant Tokmak Solar 3 Phase?
- Which company was the general contractor for PV Plant Tokmak Solar 3 Phase?
- What generating equipment (solar panels and inverters) is installed in PV Plant Tokmak Solar 3 Phase?
- What is the size of the land plot on which PV Plant Tokmak Solar 3 Phase is located?
- What are the cadastral numbers of the parcels on which PV Plant Tokmak Solar 3 Phase is located?
- What are the exact coordinates of the location of PV Plant Tokmak Solar 3 Phase?
- When were the grid connection specification forPV Plant Tokmak Solar 3 Phase issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Tokmak Solar 3 Phase
- Land allocation documentationPV Plant Tokmak Solar 3 Phase
- Construction permits and declarative documentationPV Plant Tokmak Solar 3 Phase
- Environmental Impact Assessment (EIA) DocumentsPV Plant Tokmak Solar 3 Phase
- Feed-In-Tariff Setting DocumentsPV Plant Tokmak Solar 3 Phase
The presented list reflects the directions in which information on assets is collected. On the PV Plant Tokmak Solar 3 Phase some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.