Description of the power plant
Rooftop solar power plant PV Plant Trebukhiv 1 Phase is located in north part of Ukraine - Brovarskyi district, Kyivska region, Ukraine. The power plant is putted into operation on 2015 with installed capacity- 0.06 MW. Ie Burlay O. A. is a legal entity operating the power plant. It obtained the license for electricity generation on March 10, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 18.04 eurocents starting from March 31, 2016.
Putted into opperation
Dec 2015
Installed capacity
0.06 MW
DCFeed-in-Tariff
18.04¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "ES ENERDZHI"General contractor
PJSC "KVAZAR"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Trebukhiv 1 Phase?
- What group of companies does the PV Plant Trebukhiv 1 Phase belong to?
- Who are the beneficial owners of PV Plant Trebukhiv 1 Phase?
- What is the insolation at PV Plant Trebukhiv 1 Phase?
- What is the current tariff in UAH for PV Plant Trebukhiv 1 Phase?
- Is there a local component bonus for PV Plant Trebukhiv 1 Phase and what is its size
- What is the capacity factor of PV Plant Trebukhiv 1 Phase?
- What is the monthly electricity production of PV Plant Trebukhiv 1 Phase?
- What is the annual revenue of PV Plant Trebukhiv 1 Phase?
- What market share does PV Plant Trebukhiv 1 Phase have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Trebukhiv 1 Phase?
- Which company designed the project for PV Plant Trebukhiv 1 Phase?
- Which company was the general contractor for PV Plant Trebukhiv 1 Phase?
- What generating equipment (solar panels and inverters) is installed in PV Plant Trebukhiv 1 Phase?
- What is the size of the land plot on which PV Plant Trebukhiv 1 Phase is located?
- What are the cadastral numbers of the parcels on which PV Plant Trebukhiv 1 Phase is located?
- What are the exact coordinates of the location of PV Plant Trebukhiv 1 Phase?
- When were the grid connection specification forPV Plant Trebukhiv 1 Phase issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Trebukhiv 1 Phase
- Land allocation documentationPV Plant Trebukhiv 1 Phase
- Construction permits and declarative documentationPV Plant Trebukhiv 1 Phase
- Environmental Impact Assessment (EIA) DocumentsPV Plant Trebukhiv 1 Phase
- Feed-In-Tariff Setting DocumentsPV Plant Trebukhiv 1 Phase
The presented list reflects the directions in which information on assets is collected. On the PV Plant Trebukhiv 1 Phase some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.