Description of the power plant
Ground-based solar power plant PV Plant Trostyanetska is located in east part of Ukraine - Trostianetskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2010 with installed capacity- 1.61 MW. Ltd "Alten-Invest" is a legal entity operating the power plant. It obtained the license for electricity generation on December 23, 2011 and permitted for the Feed-in-tariff in hryvnias equivalent of 46.53 eurocents starting from June 01, 2012.
From June 2019 PV Plant Trostyanetska was changed to PV Plant Trostyanetska 1 3 Stages and PV Plant Trostyanetska 4 5 Stages
Putted into opperation
Dec 2010
Installed capacity
1.61 MW
DCFeed-in-Tariff
46.53¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
PE "INVEST-SERVIS"General contractor
LTD "INTEK-INZHYNIRYNH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Trostyanetska?
- What group of companies does the PV Plant Trostyanetska belong to?
- Who are the beneficial owners of PV Plant Trostyanetska?
- What is the insolation at PV Plant Trostyanetska?
- What is the current tariff in UAH for PV Plant Trostyanetska?
- Is there a local component bonus for PV Plant Trostyanetska and what is its size
- What is the capacity factor of PV Plant Trostyanetska?
- What is the monthly electricity production of PV Plant Trostyanetska?
- What is the annual revenue of PV Plant Trostyanetska?
- What market share does PV Plant Trostyanetska have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Trostyanetska?
- Which company designed the project for PV Plant Trostyanetska?
- Which company was the general contractor for PV Plant Trostyanetska?
- What generating equipment (solar panels and inverters) is installed in PV Plant Trostyanetska?
- What is the size of the land plot on which PV Plant Trostyanetska is located?
- What are the cadastral numbers of the parcels on which PV Plant Trostyanetska is located?
- What are the exact coordinates of the location of PV Plant Trostyanetska?
- When were the grid connection specification forPV Plant Trostyanetska issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Trostyanetska
- Land allocation documentationPV Plant Trostyanetska
- Construction permits and declarative documentationPV Plant Trostyanetska
- Environmental Impact Assessment (EIA) DocumentsPV Plant Trostyanetska
- Feed-In-Tariff Setting DocumentsPV Plant Trostyanetska
The presented list reflects the directions in which information on assets is collected. On the PV Plant Trostyanetska some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.