Description of the power plant
Ground-based solar power plant PV Plant Trybusivka 2 Stage is located in east part of Ukraine - Pishchanskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2013 with installed capacity- 1.36 MW. Ltd "Vinsolar" is a legal entity operating the power plant. It obtained the license for electricity generation on April 05, 2013 and permitted for the Feed-in-tariff in hryvnias equivalent of 33.93 eurocents starting from April 25, 2013.
Putted into opperation
May 2013
Installed capacity
1.36 MW
DCFeed-in-Tariff
33.93¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "VSEM"General contractor
LTD "VSEM"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Trybusivka 2 Stage?
- What group of companies does the PV Plant Trybusivka 2 Stage belong to?
- Who are the beneficial owners of PV Plant Trybusivka 2 Stage?
- What is the insolation at PV Plant Trybusivka 2 Stage?
- What is the current tariff in UAH for PV Plant Trybusivka 2 Stage?
- Is there a local component bonus for PV Plant Trybusivka 2 Stage and what is its size
- What is the capacity factor of PV Plant Trybusivka 2 Stage?
- What is the monthly electricity production of PV Plant Trybusivka 2 Stage?
- What is the annual revenue of PV Plant Trybusivka 2 Stage?
- What market share does PV Plant Trybusivka 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Trybusivka 2 Stage?
- Which company designed the project for PV Plant Trybusivka 2 Stage?
- Which company was the general contractor for PV Plant Trybusivka 2 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Trybusivka 2 Stage?
- What is the size of the land plot on which PV Plant Trybusivka 2 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Trybusivka 2 Stage is located?
- What are the exact coordinates of the location of PV Plant Trybusivka 2 Stage?
- When were the grid connection specification forPV Plant Trybusivka 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Trybusivka 2 Stage
- Land allocation documentationPV Plant Trybusivka 2 Stage
- Construction permits and declarative documentationPV Plant Trybusivka 2 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Trybusivka 2 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Trybusivka 2 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Trybusivka 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.