Description of the power plant
Rooftop solar power plant PV Plant Vasylivka 2 is located in south part of Ukraine - Vasylivskyi district, Zaporizka region, Ukraine. The power plant is putted into operation on 2013 with installed capacity- 0.02 MW. Ltd "Vecc Oyl Hrup" is a legal entity operating the power plant. It obtained the license for electricity generation on October 24, 2013 and permitted for the Feed-in-tariff in hryvnias equivalent of 35.86 eurocents starting from December 12, 2013.
Putted into opperation
Jul 2013
Installed capacity
0.02 MW
DCFeed-in-Tariff
35.86¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "SPETSBUDMONTAZH KHKHI"General contractor
LTD "SPETSBUDMONTAZH KHKHI"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Vasylivka 2?
- What group of companies does the PV Plant Vasylivka 2 belong to?
- Who are the beneficial owners of PV Plant Vasylivka 2?
- What is the insolation at PV Plant Vasylivka 2?
- What is the current tariff in UAH for PV Plant Vasylivka 2?
- Is there a local component bonus for PV Plant Vasylivka 2 and what is its size
- What is the capacity factor of PV Plant Vasylivka 2?
- What is the monthly electricity production of PV Plant Vasylivka 2?
- What is the annual revenue of PV Plant Vasylivka 2?
- What market share does PV Plant Vasylivka 2 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Vasylivka 2?
- Which company designed the project for PV Plant Vasylivka 2?
- Which company was the general contractor for PV Plant Vasylivka 2?
- What generating equipment (solar panels and inverters) is installed in PV Plant Vasylivka 2?
- What is the size of the land plot on which PV Plant Vasylivka 2 is located?
- What are the cadastral numbers of the parcels on which PV Plant Vasylivka 2 is located?
- What are the exact coordinates of the location of PV Plant Vasylivka 2?
- When were the grid connection specification forPV Plant Vasylivka 2 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Vasylivka 2
- Land allocation documentationPV Plant Vasylivka 2
- Construction permits and declarative documentationPV Plant Vasylivka 2
- Environmental Impact Assessment (EIA) DocumentsPV Plant Vasylivka 2
- Feed-In-Tariff Setting DocumentsPV Plant Vasylivka 2
The presented list reflects the directions in which information on assets is collected. On the PV Plant Vasylivka 2 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.