Description of the power plant
Ground-based solar power plant PV Plant Velyka Dobron 2 Stage is located in west part of Ukraine - Uzhhorodskyi district, Zakarpatska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 5.91 MW. Ltd "Evd" is a legal entity operating the power plant. It obtained the license for electricity generation on November 10, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from June 26, 2018.
Putted into opperation
Mar 2018
Installed capacity
5.91 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "ELIOS STRATEHIYA"General contractor
LTD "ELIOS STRATEHIYA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Velyka Dobron 2 Stage?
- What group of companies does the PV Plant Velyka Dobron 2 Stage belong to?
- Who are the beneficial owners of PV Plant Velyka Dobron 2 Stage?
- What is the insolation at PV Plant Velyka Dobron 2 Stage?
- What is the current tariff in UAH for PV Plant Velyka Dobron 2 Stage?
- Is there a local component bonus for PV Plant Velyka Dobron 2 Stage and what is its size
- What is the capacity factor of PV Plant Velyka Dobron 2 Stage?
- What is the monthly electricity production of PV Plant Velyka Dobron 2 Stage?
- What is the annual revenue of PV Plant Velyka Dobron 2 Stage?
- What market share does PV Plant Velyka Dobron 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Velyka Dobron 2 Stage?
- Which company designed the project for PV Plant Velyka Dobron 2 Stage?
- Which company was the general contractor for PV Plant Velyka Dobron 2 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Velyka Dobron 2 Stage?
- What is the size of the land plot on which PV Plant Velyka Dobron 2 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Velyka Dobron 2 Stage is located?
- What are the exact coordinates of the location of PV Plant Velyka Dobron 2 Stage?
- When were the grid connection specification forPV Plant Velyka Dobron 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Velyka Dobron 2 Stage
- Land allocation documentationPV Plant Velyka Dobron 2 Stage
- Construction permits and declarative documentationPV Plant Velyka Dobron 2 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Velyka Dobron 2 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Velyka Dobron 2 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Velyka Dobron 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.