Description of the power plant
Ground-based solar power plant PV Plant Veryatsya 1 2 Stage is located in west part of Ukraine - Vynohradivskyi district, Zakarpatska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 1.06 MW. Ltd "Solar Blest" is a legal entity operating the power plant. It obtained the license for electricity generation on December 24, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from December 24, 2019.
Putted into opperation
Oct 2019
Installed capacity
1.06 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Veryatsya 1 2 Stage?
- What group of companies does the PV Plant Veryatsya 1 2 Stage belong to?
- Who are the beneficial owners of PV Plant Veryatsya 1 2 Stage?
- What is the insolation at PV Plant Veryatsya 1 2 Stage?
- What is the current tariff in UAH for PV Plant Veryatsya 1 2 Stage?
- Is there a local component bonus for PV Plant Veryatsya 1 2 Stage and what is its size
- What is the capacity factor of PV Plant Veryatsya 1 2 Stage?
- What is the monthly electricity production of PV Plant Veryatsya 1 2 Stage?
- What is the annual revenue of PV Plant Veryatsya 1 2 Stage?
- What market share does PV Plant Veryatsya 1 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Veryatsya 1 2 Stage?
- Which company designed the project for PV Plant Veryatsya 1 2 Stage?
- Which company was the general contractor for PV Plant Veryatsya 1 2 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Veryatsya 1 2 Stage?
- What is the size of the land plot on which PV Plant Veryatsya 1 2 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Veryatsya 1 2 Stage is located?
- What are the exact coordinates of the location of PV Plant Veryatsya 1 2 Stage?
- When were the grid connection specification forPV Plant Veryatsya 1 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Veryatsya 1 2 Stage
- Land allocation documentationPV Plant Veryatsya 1 2 Stage
- Construction permits and declarative documentationPV Plant Veryatsya 1 2 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Veryatsya 1 2 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Veryatsya 1 2 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Veryatsya 1 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.