Description of the power plant
Ground-based solar power plant PV Plant Veselynove is located in south part of Ukraine - Veselynivskyi district, Mykolaivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 9.1 MW. Ltd "Nik Hrin" is a legal entity operating the power plant. It obtained the license for electricity generation on July 18, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from July 30, 2019.
Putted into opperation
Jun 2019
Installed capacity
9.1 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Longi Solar | LR6-72PE-365M | |||
KNESS | PVIS.1000/35 | |||
KNESS | PVIS.2000/35 |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Veselynove?
- What group of companies does the PV Plant Veselynove belong to?
- Who are the beneficial owners of PV Plant Veselynove?
- What is the insolation at PV Plant Veselynove?
- What is the current tariff in UAH for PV Plant Veselynove?
- Is there a local component bonus for PV Plant Veselynove and what is its size
- What is the capacity factor of PV Plant Veselynove?
- What is the monthly electricity production of PV Plant Veselynove?
- What is the annual revenue of PV Plant Veselynove?
- What market share does PV Plant Veselynove have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Veselynove?
- Which company designed the project for PV Plant Veselynove?
- Which company was the general contractor for PV Plant Veselynove?
- What generating equipment (solar panels and inverters) is installed in PV Plant Veselynove?
- What is the size of the land plot on which PV Plant Veselynove is located?
- What are the cadastral numbers of the parcels on which PV Plant Veselynove is located?
- What are the exact coordinates of the location of PV Plant Veselynove?
- When were the grid connection specification forPV Plant Veselynove issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Veselynove
- Land allocation documentationPV Plant Veselynove
- Construction permits and declarative documentationPV Plant Veselynove
- Environmental Impact Assessment (EIA) DocumentsPV Plant Veselynove
- Feed-In-Tariff Setting DocumentsPV Plant Veselynove
The presented list reflects the directions in which information on assets is collected. On the PV Plant Veselynove some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.