Description of the power plant
Ground-based solar power plant PV Plant Vorotsiv 3 is located in west part of Ukraine - Yavorivskyi district, Lvivska region, Ukraine. The power plant is putted into operation on 2020 with installed capacity- 0.73 MW. Pe "Art-Enerho" is a legal entity operating the power plant. It obtained the license for electricity generation on December 28, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.97 eurocents starting from September 09, 2020.
Putted into opperation
Jul 2020
Installed capacity
0.73 MW
DCFeed-in-Tariff
10.97¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
PE "ART-ENERHO"General contractor
PE "ART-ENERHO"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Kehua Tech | SPI160K-B | |||
Trina Solar | TSM-370DE08M(II) |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Vorotsiv 3?
- What group of companies does the PV Plant Vorotsiv 3 belong to?
- Who are the beneficial owners of PV Plant Vorotsiv 3?
- What is the insolation at PV Plant Vorotsiv 3?
- What is the current tariff in UAH for PV Plant Vorotsiv 3?
- Is there a local component bonus for PV Plant Vorotsiv 3 and what is its size
- What is the capacity factor of PV Plant Vorotsiv 3?
- What is the monthly electricity production of PV Plant Vorotsiv 3?
- What is the annual revenue of PV Plant Vorotsiv 3?
- What market share does PV Plant Vorotsiv 3 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Vorotsiv 3?
- Which company designed the project for PV Plant Vorotsiv 3?
- Which company was the general contractor for PV Plant Vorotsiv 3?
- What generating equipment (solar panels and inverters) is installed in PV Plant Vorotsiv 3?
- What is the size of the land plot on which PV Plant Vorotsiv 3 is located?
- What are the cadastral numbers of the parcels on which PV Plant Vorotsiv 3 is located?
- What are the exact coordinates of the location of PV Plant Vorotsiv 3?
- When were the grid connection specification forPV Plant Vorotsiv 3 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Vorotsiv 3
- Land allocation documentationPV Plant Vorotsiv 3
- Construction permits and declarative documentationPV Plant Vorotsiv 3
- Environmental Impact Assessment (EIA) DocumentsPV Plant Vorotsiv 3
- Feed-In-Tariff Setting DocumentsPV Plant Vorotsiv 3
The presented list reflects the directions in which information on assets is collected. On the PV Plant Vorotsiv 3 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.