Description of the power plant
Ground-based solar power plant PV Plant Vynohradovo 4 is located in south part of Ukraine - Chaplynskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 1.77 MW. Ltd "Ses Vynohradovo" is a legal entity operating the power plant. It obtained the license for electricity generation on December 28, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from May 17, 2019.
Putted into opperation
Apr 2019
Installed capacity
1.77 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
JSC " KHERSONOBLENERHO"General contractor
LTD "ENERHOBUDPROEKT-2"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Vynohradovo 4?
- What group of companies does the PV Plant Vynohradovo 4 belong to?
- Who are the beneficial owners of PV Plant Vynohradovo 4?
- What is the insolation at PV Plant Vynohradovo 4?
- What is the current tariff in UAH for PV Plant Vynohradovo 4?
- Is there a local component bonus for PV Plant Vynohradovo 4 and what is its size
- What is the capacity factor of PV Plant Vynohradovo 4?
- What is the monthly electricity production of PV Plant Vynohradovo 4?
- What is the annual revenue of PV Plant Vynohradovo 4?
- What market share does PV Plant Vynohradovo 4 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Vynohradovo 4?
- Which company designed the project for PV Plant Vynohradovo 4?
- Which company was the general contractor for PV Plant Vynohradovo 4?
- What generating equipment (solar panels and inverters) is installed in PV Plant Vynohradovo 4?
- What is the size of the land plot on which PV Plant Vynohradovo 4 is located?
- What are the cadastral numbers of the parcels on which PV Plant Vynohradovo 4 is located?
- What are the exact coordinates of the location of PV Plant Vynohradovo 4?
- When were the grid connection specification forPV Plant Vynohradovo 4 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Vynohradovo 4
- Land allocation documentationPV Plant Vynohradovo 4
- Construction permits and declarative documentationPV Plant Vynohradovo 4
- Environmental Impact Assessment (EIA) DocumentsPV Plant Vynohradovo 4
- Feed-In-Tariff Setting DocumentsPV Plant Vynohradovo 4
The presented list reflects the directions in which information on assets is collected. On the PV Plant Vynohradovo 4 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.